Iam not trying to prolong this thread,but I do want to say that there should be an inspectionof the blocks in freeze/thaw areas. We started an inspection program of our systems or systems in the area and although we don't install ballasted systems, we found enough other things to address. On my own 8 year old system zip tie failure was over 50%. It opened my eyes to the need to do these inspections, and spec better materials at the start.

I remember the survey in Wisconsin regarding the inspecting of fairly old solar thermal systems. All the participants really seemed to love their systems, but I think over 3/4 of them were not working.


On 7/1/2018 8:02 PM, Jerry Shafer wrote:
Kirt, Chris, Wrenches
We have not had any issues other then one or two in Hawaii or California, it might be the location, concrete blocks sitting in the weather all exposed to rain from on all sides and then potential freezing conditions will cause failure of the blocks, the same issue pools will get if there are tiles around the edge when they pop off in freezing conditions but thats just me>
Jerry
NABCEP Installer and PVI


On Wed, Jun 27, 2018 at 10:20 AM, Kirk Herander <[email protected] <mailto:[email protected]>> wrote:

    All,

    I have a 6 year old ballasted roof system in which about 50% of
    the solid cap blocks(16”L x 8”w x 4”D) are cracked and crumbing,
    some are close to rubble. I assume it was a bad batch, but has
    anyone seen this before? What might be the preventive remedy in
    the future? A coating of some sort?

    *Kirk Herander*

    *Owner|Principal, VT Solar, LLC *

    */Celebrating our 27^th Anniversary 1991-2018/*

    *www.vermontsolarnow.com <http://www.vermontsolarnow.com>*

    dba Vermont Solar Engineering

    NABCEP^TM 2003 Inaugural Certificant

    VT RE Incentive Program Partner

    802.863.1202


    _______________________________________________
    List sponsored by Redwood Alliance

    List Address: [email protected]
    <mailto:[email protected]>

    Change listserver email address & settings:
    http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
    <http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org>

    List-Archive:
    http://www.mail-archive.com/[email protected]/maillist.html
    
<http://www.mail-archive.com/[email protected]/maillist.html>

    List rules & etiquette:
    www.re-wrenches.org/etiquette.htm
    <http://www.re-wrenches.org/etiquette.htm>

    Check out or update participant bios:
    www.members.re-wrenches.org <http://www.members.re-wrenches.org>





_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org


--

         Christopher Warfel, PE
       ENTECH Engineering, Inc.
PO Box 871, Block Island, RI 02807
               (401)466-8978

EEI logo <http://entech-engineering.com>
_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to