The customer needs education! The SQ should be powered from 240vac and
the CU can run a generator input if needed. AC power should be designed so
that it never goes away offgrid in my opinion. There should be a water tank
that can give time to make repairs. 

Dave Angelini Offgrid Solar
"we go
where powerlines don't"
http://members.sti.net/offgridsolar/ [1]