I'm needing to replace the master SI from a 2006 installation knowing
that it's only a matter of time until the slave gives up the ghost. I
want to recommend to the elderly owner that she replace both units at
the same time since I already replaced the original 5 SBs with two new
SBs less than a year ago and the 640Ah battery two years ago.
Being several years retired now I have not kept up with the advances in
GT-BB controllers and so need to hear what the options for a split phase
240v replacement this established body of specialists would recommend to
keep this system going another decade or more.
Thanks
Jim Duncan
North Texas Renewable Energy
_______________________________________________
List sponsored by Redwood Alliance
List Address: [email protected]
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/[email protected]/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org