Hey Peter, Thanks for the input, I recently had another installer recommend them to me a couple weeks ago so Ill check them out. Do you know if they can handle the lithium ion batteries? Kinda looks like they have their own battery?
Andrew Perkins Greenwired P: 707-923-2001 ext. 100 1150 #1 Evergreen Rd Redway, CA 95560 www.greenwired.com Description: signature From: RE-wrenches [mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of pgir...@mindspring.com Sent: Monday, June 24, 2019 12:06 PM To: 'RE-wrenches' Subject: Re: [RE-wrenches] AC/DC coupling on conext Andrew Take a look at the Sol-Ark product. Far more robust than the SE and probably the best hybrid on the market. Can take up to 11 kw worth of solar, 8 kw AC of output with high peak levels. Easy to wire and the customer support is great. Does work with rapid shut down from a few vendors. We have been very happy with the production #s as well as the battery charging and management. Can be programed to power the CL panels as well as the main panel without selling back to the grid. Thx Peter Giroux ASAE From: RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> On Behalf Of Andrew Sent: Monday, June 24, 2019 2:18 PM To: RE-wrenches <re-wrenches@lists.re-wrenches.org> Subject: [RE-wrenches] AC/DC coupling on conext Wrenches, I got a situation where I got a client who wants to get solar with battery backup but where he is located the grid cannot currently accept incoming solar, but we can buy from them. I was thinking about doing an conext xw system and then solaredge ac coupling for module level shutdown but I don't know how well that would be on the conext side of things for charging some discover lithium ion batteries? I would rather do standard DC coupled system but not familiar with any of those 3rd party rapid shutdown devices(fire raptor and midnite?), has anyone used any before? Andrew Perkins Greenwired P: 707-923-2001 ext. 100 1150 #1 Evergreen Rd Redway, CA 95560 www.greenwired.com Description: signature
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org