Hey Jay,
Why not just use 8 SMA SB 7.7's = 61.6 KW rated, 32 Amps 240 each.
Then use a dedicated 320 Amp Rated (Typical nominal bus of a 400 A
panel) Supply Side fed Breaker panel as you'll have 256 x 1.25 Amps of
Solar bus = 320 - right at the limit but you are good to go!
Jeff
Chris Sparadeo wrote on 2/8/20 7:42 PM:
Jay,
Sorry, I missed the 120/240v part. That CPS product is 3 phase.
Fronius has the Primo 15kW in split phase. Have had good luck with them.
On Sat, Feb 8, 2020 at 10:30 PM Chris Sparadeo
<[email protected] <mailto:[email protected]>> wrote:
Hi Jay,
CPS has a 60 kW -1000v string inverter that might be a good fit
for your project.
https://www.chintpowersystems.com/commercial-60kw.shtml
Best,
Chris
On Sat, Feb 8, 2020 at 8:54 PM jay <[email protected]
<mailto:[email protected]>> wrote:
HI All,
I’m wondering what the largest GT battery less inverter (and
what people recommend) for 240v 60hz is out there.
I don’t need MLPE, as project would be ground mount, its large
residential, potentially 60KW.
SE has their 11.4KW, but I’ve heard lots of bad things about
them recently.
Fronius has a 10KW?
Thanks in advance
jay
Peltz power
_______________________________________________
List sponsored by Redwood Alliance
List Address: [email protected]
<mailto:[email protected]>
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/[email protected]/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
<http://www.re-wrenches.org/etiquette.htm>
Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org>
--
Chris Sparadeo
C_802-369-4458
H_802-728-3059
--
Chris Sparadeo
C_802-369-4458
H_802-728-3059
_______________________________________________
List sponsored by Redwood Alliance
List Address:[email protected]
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:http://www.mail-archive.com/[email protected]/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org
--
~~~~~~~~~~~
Jeff Clearwater
Village Power Design
linkedin <https://www.linkedin.com/in/jeff-clearwater-0622a312/>
www.villagepowerdesign.com <http://www.villagepowerdesign.com>
cell - 413-559-9763
~~~~~~~~~~~~~~~~~~~~~~~
_______________________________________________
List sponsored by Redwood Alliance
List Address: [email protected]
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/[email protected]/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org