When installing a system with more than two Encharge 10 batteries, a separate load center needs to be used to combine AC battery output. It would just require two 2-pole breakers in a MLO panel. But I believe both of those breakers would need to be fastened down.
If anyone is doing this, are you aware of a small four-space panel where you can put a hold down kit in both 2-pole breakers? Model number would be greatly appreciated. My Eaton rep claims that their breaker hold down kit only works in panels 150A and greater and only one space is provided for a hold down kit. Other than that, you would have to go to a panelboard with bolt on breakers. That doesn't sound right to me. Jason Szumlanski Florida Solar Design Group
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/[email protected]/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org