Hi William, One possible path forward would be to ask the utility co what AC inverter capacity would be allowed. Maybe the solution would be to unplug a micro or two if you are just over the limit. Even better, maybe they would allow you set an export limit on the micros you have installed. I had a recent situation where a 40kW DC system had exceeded a utility transformer by only 2kW AC, so a simple redesign avoided an $8k invoice from the utility. The utility was not transparent about this option at first and only made it clear after some persistence. Good luck, Garrison Riegel Celestar Solar On Dec 25, 2022, at 3:14 PM, Darryl Thayer via RE-wrenches <[email protected]> wrote:
|
_______________________________________________ List sponsored by Redwood Alliance
Pay optional member dues here: http://re-wrenches.org List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/[email protected]/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org