Have not used them in some time, but used to a LOT and generally happy with them.
http://www.solarbos.com/Products Lead times were a bit long, in the 1-2 month range, but who knows what they are now, last time I used them was pre-pandemic. -- Danny Young NABCEP PV Installation Professional #031508-90 Engineering Team Lead Solar Energy Solutions Lexington | Louisville | Bloomington | Cincinnati | Evansville | Indianapolis 513-448-5176 (mobile) 877-312-7456 (Main Office) [email protected]<mailto:[email protected]> From: RE-wrenches <[email protected]> On Behalf Of Mac Lewis via RE-wrenches Sent: Sunday, February 26, 2023 10:54 AM To: RE-wrenches <[email protected]> Cc: Mac Lewis <[email protected]> Subject: [RE-wrenches] 1000Vdc Combiner Block, Fusing Good Morning Wrenches, I am looking for suggestions on suppliers that work in the 1000Vdc UL listed equipment space. Specifically, I'm trying to build a 1000Vdc rated combiner (Combining 4 x 100A rated battery outputs up to 900Vdc) as well as add OCPD (fuse or breaker) on the output going to the storage inverter. I'd love to find a packaged UL listed combiner for this, but I've had no luck with that. Any suggestions/supplier contacts are appreciated Thanks! -- Mac Lewis "Yo solo sé que no sé nada." -Sócrates
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/[email protected]/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org

