Hi Dana;

What code section is he/ she referencing?  Many times, wires are left too short to land on a particular breaker or buss, so splices in the load center happen even in regular electrical work.  Our inspectors here consider a load center the same as any other electrical enclosure: subject to wire and splice fill requirements.  We've beaten this dead horse subject before, many years back.

So your inspector would require you to tear into a finished wall to install a gutter, just to relocate a breaker in the same panel, and extend the circuit wire with a splice?  What if you accidentally cut one neutral wire a few inches short; suddenly you need the custom plaster crew back out to patch?   I've had MLPs installed in walls with very expensive wall finishes. I'm not tearing into that wall unless it's the only way.   The majority of inspectors are not electricians.

Code citations, please.

Thanks,

Ray Walters
Remote Solar

On 8/1/2024 2:44 PM, Dana Orzel via RE-wrenches wrote:

Wire nuts in a breaker panel are not allowed per my inspector per code.  Pull the Romex out of the breaker panel & spllce in a wire gutter to extend.

I have seen this enforced twice now.

_________________________________________________________

Dana Orzel GREAT SOLAR WORKS!

C – 208.721.7003      E – [email protected] <mailto:[email protected]>

W - www. greatsolarworks.com www.solarwork.com <http://www.solarwork.com/>

/_“Responsible Technologies for Responsible People since 1988!”_/


_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here:http://re-wrenches.org

List Address:[email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to