(sorry sent the previous reply before it was complete) Hi Jason, Currently Tesla doesn't allow any totally off-grid installations with PW3 or PW3, they used to support this through the Gateway but no longer do.
In addition, the Powerwall 3 will require at least a single MCI per string to pass the self test function. This also limits the total string loop length from MPPT+ to MPPT-. Powerwall 3 does contain the site controller, but it will require some islanding contactor to function properly. *Vince Jolissaint |* *Director of CAD Services* 2557 Wyandotte Street | Mountain View, CA 94043 Office: 650.938.9574 | Email: [email protected] >From: Jason Szumlanski <[email protected]> >To: RE-wrenches <[email protected]> >Subject: [RE-wrenches] Powerwall 3 >Message-ID: > <CAE438R9LWo_VNuTTkOzVbv62LST3_Bf4-x7VfLm=-rkk6k+...@mail.gmail.com > >Content-Type: text/plain; charset="utf-8" >Certified Powerwall installers, >Can the PW3 be commissioned for for a completely off-grid system with DC >coupled solar panels with no MCIs. If so, do you need a Gateway 2/3, or can >it operate autonomously in this scenario without a Gateway? > >Jason Szumlanski >Florida Solar Design Group
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/[email protected]/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org