Hi Jason,

Currently Tesla doesn't allow any totally off-grid installations with PW3
or PW3, they used to support this through the Gateway but no longer do.

In addition, the Powerwall 3 will require at least a single MCI per string
to pass the self test function. This also limits the total string loop
length from MPPT+ to MPPT-.

Powerwall 3 does contain the site controller, but it will require some
islanding contactor to function properly.

*Vince Jolissaint |* *Director of CAD Services*

2557 Wyandotte Street | Mountain View, CA  94043
Office: 650.938.9574 | Email: [email protected]

>From: Jason Szumlanski <[email protected]>
>To: RE-wrenches <[email protected]>
>Subject: [RE-wrenches] Powerwall 3
>Message-ID:
 >       <CAE438R9LWo_VNuTTkOzVbv62LST3_Bf4-x7VfLm=-rkk6k+...@mail.gmail.com
>
>Content-Type: text/plain; charset="utf-8"

>Certified Powerwall installers,

>Can the PW3 be commissioned for for a completely off-grid system with DC
>coupled solar panels with no MCIs. If so, do you need a Gateway 2/3, or can
>it operate autonomously in this scenario without a Gateway?
>
>Jason Szumlanski
>Florida Solar Design Group
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to