Our local utility has a requirement that ALL generation be sold to them at 
avoided cost, and that ALL purchases be made at tariff rate.  A couple of years 
ago before installing an EG4 system (which I did my first one this past year), 
I told the president of the coop that I did not think that was possible with 
multi mode systems.  I've tried a lot of different settings in the EG4 but it 
seems not to make a big difference.


Does anyone have knowledge of how to do this?  Signature Solar did not have a definitive answer, and what we have tried so far, has not really produced the results I was hoping for.


Thank you, Chris


--
Christopher Warfel, PE
ENTECH Engineering, Inc.
PO Box 871, Block Island, RI 02807
(401) 447-5773

_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to