Hi guys

We have vacancies/events pages that have an end date and I currently use 
in-page RQL to set a linking/appearance schedule based on this date.

I realise it would be far better to run this as a user-defined job, looping 
through all events/vacancies and adding the schedule 'out of hours' to 
avoid performance drain on the system.

Anybody any idea how to set this up as an .asp file?

I know about searching for the pages based on template GUID x, storing the 
results in an array, and then for each page guid, encoding the date, and 
setting via RQL.

Trying to turn this into a job that runs separately, however, is really 
tricky.

Anybody done anything similar?

Thanks

Neil


-- 
You received this message because you are subscribed to the Google Groups 
"RedDot CMS Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/reddot-cms-users?hl=en.
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to