At 3/7/2009 08:59, you wrote:

>I did a analysis on a transmitter site using the TCS intermod tool to see 
>what mixes could be causing some issues at this site. I ran the 1-3 order 
>and 1 to 5 order.
>
>
>
>So I do not use these tools much and was wondering if any of my fellow 
>engineers on here have used this tool and have comments on the output. For 
>example this line from the output confuses me:
>
>A+B+C-D-E: 146.70000 + 145.77000 + 145.09000 - 145.73000 - 145.73000 = 146.10
>
>It is a hit right on the input but how do you minus 145.73 twice? Is this 
>just an issue with the program I am using?

I should say 146.700 + 145.770 + 145.090 - 2 * 145.730 = 146.100

It's actually an A+B+C-2D mix.

Bob NO6B

Reply via email to