Hi all. Looking for some advice on exec2 pa variations. The 35-60 watt version is my choice for making 2 and 440 repeaters. I recently noticed a variation in the power control method. One had the stud mounted thermister with the black control module and one has just the pot for poower control
My question is: for repeater service is the use of the thermister and module going to be problematic. Do they have a high failure rate? I have had some friends whol have had failures with theirs on Master2 PAs and have had to bypass the circuit. Just wondering if it is a good idea to go ahead and just bypass now instead waiting until later if there is a high failure rate. The repeater is not local. Appreciate any advise. PSE email direct to [email protected] Thanks , Dale K0JXI

