I'm actually thinking about getting rid of the "segue to next log", if there is 
a way to load next days log "manually" of with RDCatch. Now to find out if 
there is such an option ...


Sincerely,


Peter van Embden

Radio Capelle

The Netherlands



Verstuurd



Van: Rick
Verzonden: ‎zaterdag‎ ‎12‎ ‎april‎ ‎2014 ‎00‎:‎59
Aan: [email protected]


I have one hardtimed event @ the last item before the log chain  , this forces 
the rotation to the next day with a silence of 6 seconds until we implement the 
script I was sent 



Peter van Embden schreef op 12-4-2014 0:15:



Hello,

 

Our log just started to play over at the start of the log, without chaining to 
the next day. We're trying to get our NEWS floating, but with a maximum waiting 
time (1.30 after the hour). Works fluently for 23 hours, except for midnight. 
Now I'd like to force the loading of the next log at 23.59.30. Is that possible?

 

Thanks in advance,

 

Peter van Embden

Radio Capelle

The Netherlands


 

Verstuurd

 



_______________________________________________
Rivendell-dev mailing list
[email protected]
http://caspian.paravelsystems.com/mailman/listinfo/rivendell-dev
_______________________________________________
Rivendell-dev mailing list
[email protected]
http://caspian.paravelsystems.com/mailman/listinfo/rivendell-dev

Reply via email to