> Coming from a RCS Master Control background, its impossible to have that > system auto load the wrong days log. The on air playout module will by > design only automatically air a log for January 15 on January 15.
Having also worked with RCS Master Control and Selector, I agree that this is one of the features of that system which works nicely and also allows for the appearance of having one big long log without having to load a new log each day at midnight. While I admit that I have not looked into its database structure to see how it does this, I suspect that it has a date field as a part of its database structure for storing logs. I'm not sure if this would be possible to do within Rivendell's current structure. _______________________________________________ Rivendell-dev mailing list [email protected] http://caspian.paravelsystems.com/mailman/listinfo/rivendell-dev
