Dear All

I am sharing a response to a Press Conference we held recently
highlighting the very weak technical and work safety issues in the
Bangalore Metro project. THe Press RElease is enclosed.

Subsequently, Mr. Sivasailam, MD, Bangalore Metro has responded to us in
great detail. and this letter is also enclosed.

I wish to draw the attention of RTI activists to a particular point in
the response of the MD, wherein we have been threatened with dire action
if we did not remove the DPR of the Blore Metro from our website:
www.esgindia.org. This DPR was secured by us under RTI after substantial
resistance. It must also be shared that we have insisted that such
documents in all projects are public domain and form a critical
responsibility for public autorities to disclose per the suo moto
disclosure provisions of the RTI Act. Please note that a particular
reference is made of such display of the DPR on our website as violative
of the copyright of Delhi Metro over these documents, as they were the
consultants.

Your views on this matter will be deeply appreciated.

Thank you

Leo Saldanha
Environment Support Group
www.esigndia.org

-------- Original Message --------
Subject:        FW: Press Release: STOP WORK AND REVIEW BANGALORE METRO DESIGN
AND SAFETY ASPECTS - Some minor corrections please - reg
Date:   Thu, 6 Aug 2009 17:58:22 +0530
From:   MDBMRC <[email protected]>
To:     <[email protected]>



Sir,

1. In Para 3, below for the words ‘Please rest assured that it is done
by the best in business who also proof-checked by very competent design
engineers’ read as ‘Please rest assured that it is done by the best in
business which is also proof-checked independently by another set of
very competent design engineers’.

2. In para 8, below for the words, ‘We are sure that you would like to
be party to such incidents’, the words, ‘We are sure that you would
_not_ like to be party to such incidents’.

N Sivasailam

MD BMRCL

*From:* MDBMRC [mailto:[email protected]]
*Sent:* Thursday, August 06, 2009 4:24 PM
*To:* '[email protected]'
*Subject:* RE: Press Release: STOP WORK AND REVIEW BANGALORE METRO
DESIGN AND SAFETY ASPECTS

Sir,

Please see the press release below. Para-wise replies are noted below.
Since I do not have the email addresses of all the persons and lists to
whom you have sent your press release, We request that you may send this
response to all the email addresses and email lists to whom you have
sent your press release and also to the newspapers to whom you have sent
the press release. I hope it is not asking too much of you considering
that you are spreading the word about Namma Metro around – all for the
good, we presume.

3. It is reiterated that the deaths and injuries in all the cases are
accidental. This is our view based on our detailed internal inquiry by
expatriate experts and we are confident of defending this view. In all
the instances, police cases have been registered. Therefore, we can also
have a final view based on the investigations in these cases. While we
have given a lot of stress on safety issues, it is unfortunate that such
accidents have occurred inspite of our best efforts. We invite you to
visit the sites to appreciate the safety norms at the site and the
safety understanding by the workers at the site. It is continually on
the increase and we are doing more. We have stepped the efforts over the
last three months and it has been well received by the workers. It is
our constant endeavour to ensure that safety standards are continually
improved. Your support in creating a congenial environment outside the
work area particularly in CMH road and RV Road will help. We have done
our bit and continue to do so, by improving roads in some stretches
where it is possible for us to do so without becoming a burden on the
project, co-ordinating with BWSSB to install new lines, encouraging
planting of saplings etc. Your suggestions on how to improve matters in
Namma Metro working short of stopping the Metro work will help the cause
of the public work.

4. It is wrong to state that the reinforcement structure collapsed. It
bent and was restored for carrying on the work further. It is surprising
that you continue to be unaware of it. This was reported by all the
papers that carried the news of the reinforcement structure bending.
Selective appreciation of events can do more harm than good and tends to
indicate a bias. Presently, we are awaiting re-confirmation by testing
of the material strength of the rods before we go ahead. Preliminary
site enquiries indicate that the cause of bending is because of adoption
of improper techniques by the site workers and site supervisory failure
in following the correct sequence of methods. All such incidents are
inquired and this one too will be inquired in detail and lessons learnt
though prima-facie lessons are quite clear to us regarding the
importance of following the sequencing of works correctly which the site
workers and supervisors should not alter.

5. The design of the structure including reinforcements is correct,
proper and adequate. The design contract is independent of construction
contract and the design incorporates the heavy construction loads as
well. We are confident of our designs. Please rest assured that it is
done by the best in business who also proof-checked by very competent
design engineers.

6. BMRCL takes responsibility for all the designs and construction works
at all the work sites as the Principal Employer. BMRCL will not shirk
its responsibility and it will do whatever it can to ensure that our
structures are designed well and constructed well. We have in place a
good system of quality assurance. There is a requirement to compile test
reports for the commissioning of any line and BMRCL is compliant with
the requirement. The design of structures in Namma Metro is based on the
soil and strata of Bangalore. Designs cannot be copied verbatim as
implied in the press release. The design is to be done based on the
operational loads and also the construction loads. These aspects have
been taken into account in respect of every design of all structures.
The comments made in your Press Release in respect of Delhi Metro is
based on selective information since it does not indicate the response
of Delhi Metro and we have reason to believe that your press release
castigating DMRC may be biased and prejudiced. Further the CAG report is
on a subject matter that does not relate to Bangalore Metro and hence
your application of the same to Namma Metro by analogy is cleared
indicative of your prejudiced attitude to both the institutions.
Bangalore Metro’s designs are designed independent of Delhi Metro
designs since the loading conditions are different. The Designs are
independently done by experienced designers and proof checked by
international consultants who have substantial experience in the works.
The project is monitored based on a Baseline program agreed at the
beginning of the contract. There are no compulsions in Namma Metro to
beat any deadlines. The revised deadline for the opening of Reach 1 is
Dec 2010 and is realistic. Kindly recall the criticism that Namma Metro
is about 9 months late since the original deadline was March 2010. We
have not revised our deadline to March 2010 since in our opinion it will
not be prudent/possible to do so except with substantial speeding up of
civil works that may compromise safety and quality. Hence the Board of
Namma Metro has consciously decided to stick to the Dec 2010 schedule
and try to achieve it without sacrificing safety and quality. The
apprehensions about Delhi Metro and Namma Metro Designs of structures is
misplaced and based on misinformation or bias.

7. Yes, it is true that Mr Ramesh sought certain information under RTI
act. We have provided him with a reply. He has remedies under the act if
he is aggrieved. It is not clear how the ESG is advocating his cause and
concluding that we are in the wrong. BMRCL is a law-abiding organization
and will do everything lawfully. It has also the right to protect its
commercial interests in accordance with law and ESG has no locus standi
to advise, counsel or castigate BMRCL regarding the manner in which it
should be provide information under the Act. We genuinely believe that
Mr Ramesh is not entitled to the information he has sought – it has been
done so by a written endorsement and if corrected by a superior
authority under the Act, we will abide by it. Mr Ramesh even resorted to
the gimmick of staging a dharna before our office instead of seeking
redress under the Act to which he is entitled but which was not the
course adopted by him. It is surprising that ESG has not stand on the
extra-legal methods resorted to by the person to force compliance under
the act without seeking redress under it. As regards making available
documents to JICA, yes, they are funding the project based on an
agreement with Government of India and have their conditions for
funding. On that basis, they are entitled to receive documents of
certain nature pertaining to the project.

8. *It is true that you have procured a copy of the DPR under the Right
to Information Act. It is for your use. Your publishing it on your
website is a violation of our copyright. You are instructed to
immediately remove it from your website since it is illegal to publish
it publicly and we have not permitted you to do so. There are other
implications from the security aspects of the Metro under which we have
been advised that sensitive information such as DPRs, concept or
detailed designs etc of Metro structures may not be published. We
request you to co-operate. It is not necessary that general citizens
should be given free access to DPR. It is also possible that your
benevelonce in providing free access to our DPR is abused by certain
others – both commercially and physically detrimental to our interests
and that of our citizens. We are sure that you would like to be party to
such incidents. Kindly appreciate.*

9. It is not necessary to dwell at length in the Navayuga ‘PIL’ case
because it has been dismissed at the very first hearing! Do We need to
dwell into the reasons and provocations for Navayuga to file the PIL
while being the contractor in the project! It is his responsibility to
ensure safe construction and therefore he cannot file a PIL on a matter
in which he is primarily responsible for execution of the contract. On
his failure to submit a safe working plan for CMH road viaduct
construction, the work has since been taken away from him for execution
at his risk and cost. We are aware of the High court instructions in the
matter and we are following it in letter and spirit. Also the direction
is equally and more applicable to Nayayuga whose cause you are
advocating We need to assure you that subsequent to filing of the PIL,
Navayuga has marginally improved in his safety record as well.

10. The contractor going to court filing a PIL is a joke and an abuse of
the process of the court since he is responsible for execution of the
work in the stretch and he has accepted the contract voluntarily. The
High Court has rightly dismissed the petition at the very first hearing.
Your compulsions in taking the side of the contractor who has been
instrumental in delaying the project works is surprising and intriguing.
We wish to inform you that we follow the highest standards of integrity
in our organization and work sincerely. There are more than 1000
engineers of BMRCL/GC to BMRCL, contractors and technical consultants –
all qualified technical personnel and professionals who are working on
the project or are associated with it. You are making a mockery of all
of them by your ill-advised remarks – literally shooting of the hip!
Make no mistake – Namma Metro will be there inspite of all prophecies of
doom. It will be there because most people and institutions sincerely
believe that we will deliver and that is a solemn promise to the
citizens of Bangalore including the doubting thomases. It will our
endeavour to make you believe too. We are an institution and function as
one and believe in the goal of realizing the dream of Namma Metro for
Bangaloreans. Encouragement and support will help motivate us but
misplaced criticism and misplaced views articulated as facts will not
deter us from our task. Yes, we are also sensitive to criticism and
comments that are positive as our track record of interacting with
institutions and courts will testify.

In summary, We wish to inform you that your plea for stopping the Metro
works is against public interest and your grounds are based on incorrect
and inadequate understanding and appreciation of facts besides an strong
undercurrent of prejudice and bias. We request you to play a more
positive and pro-active role in the construction of Namma Metro through
constructive engagement not only with Namma Metro but also with a large
number of reputed institutions and organizations working in partnership
with Namma Metro at this stage of the project when the entire tendering
process of selecting institution/contractor-partners is nearing
completion (95% completed) and this principle is itself based on your
own philosophy of constructive participation that you so passionately
advocate.

N Sivasailam

MD BMRCL

*From:* [email protected]
[mailto:[email protected]] *On Behalf Of *ESGINDIA
*Sent:* Wednesday, August 05, 2009 5:35 PM
*To:* [email protected]; [email protected];
[email protected]; [email protected];
[email protected]; [email protected]
*Subject:* Press Release: STOP WORK AND REVIEW BANGALORE METRO DESIGN
AND SAFETY ASPECTS

Press Release : 05 August 2009 : Bangalore

*STOP WORK AND REVIEW BANGALORE METRO DESIGN AND SAFETY ASPECTS*

The safety of Bangalore Metro Rail Project has been called to question
many times over the past couple of years. Several deaths and injuries
have been the result exposing the poor attention accorded to worker and
public safety. While some of the causes of death and injury may have
been accidental, careful scrutiny reveals that there is much more to be
worried about than to wish away such events as merely accidental.

Two days ago the main reinforcement structure of a Metro pillar
collapsed on the narrow CMH Road even as it was being mounted. Metro
officials were quick in dismissing this event as nothing to be alarmed
about. But such dismissals are only to be expected, when such events are
the norm and not the exception.

What is frightening about the recent CMH Road event is that the
reinforcement structure is designed to lend strength to a pillar that
will carry the static and dynamic load of a section of the elevated
corridor, and upon which trains will run. As it keeled over and fell
Metro officials were quick to blame the workers at the site – expectedly
of callousness. Had this happenned once the structure was filled with
concrete, and then laid over with the heavy slabs, who would they blame
then?

It is well known that the Bangalore Metro is absolutely modelled on
lines of the Delhi Metro. Subsequent to the recent damning report of
Comptroller and Auditor General of India on the systemic and systematic
failures in ensuring quality work in the Delhi Metro (particularly in
Phase II), it was imperative for the Karnataka Government to immediately
stop work and conduct a thorough review of the Bangalore Metro. The CAG
report significantly has highlighted that there were serious design
failures in the Metro structures and that the rush to implement that
project to meet unhealthy deadlines probably contributed to the recent
disasters during the launching of girders. Rather than meet this very
unbiased account by a Constitutional authority, BMRCL rushed to do what
was expected: issue a reassuring statement that all is well with its
designs.

Bangaloreans deserve better than statements. They deserved proactive and
verifiable effort that the Metro designs are absolutely beyond any
doubt. That has simply not happenned because almost all the
techno-economic details of the project are under wraps – on grounds of
confidentiality. Even former Mayor Mr. P. R. Ramesh was unable to access
reports that ought to have been part of the public domain. Such details
are librerally shared in every Metro project across the world, including
in Japan which substantially finances this project. The irony is that a
Japanese national could access reports of “Namma Metro” with ease simply
because they have extended a commercial loan to the project. But we who
will bear the burden of this mega project for generations simply have no
access to this very information.

When ESG sought access to the Detailed Project Report of the Bangalore
Metro, after considerable delay BMRCL parted with the document for a
very heavy price of Rs. 2,600/-. When enquired why it was not made
available on the Metro website as part of the /suo moto/ disclosure
responsibility per the Right to Information Act, BMRCL officials
extended wishy washy responses. In the wider public interest, ESG has
now issued the complete DPR of the Bangalore Metro on its website /in
toto/ (Please check _www.esgindia.org <http://www.esgindia.org/>_).

Lack of transparency is one of the first troubling indicators in project
implementation. In the Bangalore Metro case, the situation is so
alarming that M/s Navayuga Constructions implementing the CMH Road
section filed a PIL against BMRCL in the High Court of Karnataka
claiming it was impossible to ensure safety of the structures given the
narrow right of way available on CMH Road and inability of moving heavy
equipment. Papers have reported that “Navayuga .... had repeatedly
warned BMRCL authorities against going ahead with 'segment launch'
method of construction on CMH Road in Indiranagar as it endangered the
lives and property of residents and shopkeepers on the road.” A more
critical question raised was if it would at all possible to bring in
equipment to respond in an emergency – such as a train accident –
considering that the right of way was completely consumed by built Metro
structures? The High Court has disposed this petition with the direction
to BMRCL to address these safety concerns.

A project contractor going to Court with a PIL to advance safety issues
is a rare and probably unprecedented step. Less than a fortnight of the
High Court's decision, the CMH Road pillar has collapsed, and the worry
now is how to retrieve the reinforcement structure? Once this is done,
the question will always remain if the design is at fault. Sure an
enquiry has been ordered by BMRCL, but how much can we trust such
in-house enquiries in light of the rather poor worksite management and
safety record of BMRCL?

Consider these “accidents”:

· In simple tasks such as bringing down buildings in the way of the
Metro, there have been at least three reported accidents that have
claimed 2 lives and injured 4 workers.

· A Metro pillar also caught fire!

· A JCB executing work collapsed on CMH Road – thankfully not toppling
onto the neighbouring building.

· Another JCB backed up on M. G. Road and killed an unfortunate worker.

A barricade crashed onto a car on Old Madras Road, and the driver was
fortunate to escape.

And these are instances when less then 20% of the superstructure of
Phase I is being built, and that too in the past year alone.

The human rights record of BMRCL has also been terribly found wanting.
M/s Nagarjuna Constructions implementing the southern reach of the Metro
was caught employing child labour. It was only because of the
intervention of ESG, Hasiru Usiru and the Karnataka Child Welfare
Committee that one of the three children employed was rescued and
rehabilitated. Shockingly, no criminal action was at all initiated
against the contractor, despite tall claims that such action would follow.

Clearly such instances should have caused a lot of alarm in the
Government and the Legislature. However, there has been little or no
discussion at all on such critical failures. For a structure that is
likely to remain in Bangalore for over a century, the spate of what are
claimed to be “accidents” does not at all build confidence in the wide
public that all is well with the Bangalore Metro project.

Keeping this in view, and the need to ensure such a massive project is
beyond any doubt on the issue of safety (especially considering that it
is largely built on elevated structures), it is absolutely essential
that the Government of Karnataka takes steps for immediate and
corrective action.

*We, therefore, demand that the Government must institute an Independent
Commission of Public Enquiry into the design and worksite safety issues
of the Bangalore Metro. Pending this enquiry, ongoing work on the
project must be stopped.*

*We demand such action is essential because it is critical in the wider
public interest and the interest of future generations to get this
project absolutely right. Rather than awfully wrong.*

Justice M. F. Saldanha

Former Judge of the High Court of Karnataka

        

Ms. Premila Nesargi

Senior Advocate

Leo F. Saldanha

Coordinator

Environment Support Group

        

Vinay Sreenivasa

Volunteer

Hasiru Usiru

For further details and information, please contact Ms. Divya Ravindranath:

*Environment Support Group ®*

1572, 36^th Cross, 100 Feet Ring Road, Banashankari II Stage, Bangalore
560070

Tel: 91-80-26713559/26713560/26713561 Voice/Fax: 91-80-26713316

Email: [email protected] <mailto:[email protected]>_ or
[email protected] <mailto:[email protected]>_ Web: _www.esgindia.org
<http://www.esgindia.org>_




[Non-text portions of this message have been removed]



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/rti_india/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/rti_india/join
    (Yahoo! ID required)

<*> To change settings via email:
    mailto:[email protected] 
    mailto:[email protected]

<*> To unsubscribe from this group, send an email to:
    [email protected]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/

Reply via email to