On 15/07/2011 08:56, Geoffrey De Smet wrote:
There should be no 5.2.1. Only 5.3. Seems there is a jira too. Best
to nuke the 5.2.1 jira and upate everything to 5.3.
So there's no point in backporting issues to the 5.2.x branch?
ALL fixes must be backported to 5.2.x branch. There just will be no
5.2.1 release, only 5.3.
Should I spend time fixing the issue build issue on the 5.2.x branch
or does the workaround suffice?
Do we need to revert some POMs or something, or are we too late or
is everything OK?
Also, if you git clone (I rebased, but assume the same) 5.2.x it
fails to compile due to parental issues (references 5.2.1).
The workaround is to clone all of droolsjbpm, and build with mvn-all.sh.
Technical details:
To avoid some issues with the jbpm installer URL's, I believed it
would be easier to put the branch on 5.2.1 directly instead of
5.2.1-SNAPSHOT as it should be.
Those unfinished 5.2.1's are deployed to a nexus staging repository
(which is a dead end), so they are not released.
However... since those snapshots aren't available on a real repository
(being the release or snapshot respository), you can't build a git
repo without building everything.
Mark
Geoffrey?
_______________________________________________
rules-dev mailing list
rules-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/rules-dev
_______________________________________________
rules-dev mailing list
rules-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/rules-dev
--
With kind regards,
Geoffrey De Smet
_______________________________________________
rules-dev mailing list
rules-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/rules-dev
_______________________________________________
rules-dev mailing list
rules-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/rules-dev