Hi,
Three question about multiple controllers operations,
1. Do Controller A & B sync info with each other?
2. If A (master) "leave", B "join", what happen will be in OpenFlow switch or 
in 
OVS? refresh all flow tables? 
3. If A join Again, B will goes back to slave or remind master? flow tables 
changes?


Bill Jean@xinguard


------------------------------------------------------------------------------
Symantec Endpoint Protection 12 positioned as A LEADER in The Forrester  
Wave(TM): Endpoint Security, Q1 2013 and "remains a good choice" in the  
endpoint security space. For insight on selecting the right partner to 
tackle endpoint security challenges, access the full report. 
http://p.sf.net/sfu/symantec-dev2dev
_______________________________________________
Ryu-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/ryu-devel

Reply via email to