Photos in my album.  It's a long slow process and really dosen't look like 
much has happened. Right! Except for all those little hidden things: Stripped 
screws, misaligned holes, broken solder joints, cold solder joints, The 
patterns and castings that that needed to be made. Castings that were actually 
cracked and need to be silver soldered together!   Unsoldering and resoldering 
super structure componets that should have been installed correcttly from the 
factory in the first place. 
    Except for the inside of the boiler front the model on the right in the 
photo is factory stock and the ones on the left have been reworked. The hardest 
part was really getting rid of the bolted on skirts and going to solder on 
skirts which meant redoing the entire front pilot location and the front steps.
    it's a good thing I'm not trying to build an empire in a 5000 square foot 
space. The digging in my cave would be just too much. I have more of these 
GS-4's and I think I will convert one to a GS-3. I really only need to make a 
new tender wrapper and a new boiler front. 

Rusty



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/S-Scale/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/S-Scale/join
    (Yahoo! ID required)

<*> To change settings via email:
    [email protected] 
    [email protected]

<*> To unsubscribe from this group, send an email to:
    [email protected]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/

Reply via email to