#17433: projective point equality fails for quotient base rings
-------------------------------------+-------------------------------------
       Reporter:  bhutz              |        Owner:  bhutz
           Type:  defect             |       Status:  needs_review
       Priority:  major              |    Milestone:  sage-6.5
      Component:  algebraic          |   Resolution:
  geometry                           |    Merged in:
       Keywords:                     |    Reviewers:
        Authors:                     |  Work issues:
Report Upstream:  N/A                |       Commit:
         Branch:                     |  8e3e894f5f5fac85062f7c035eaf273ca782fa52
  u/bhutz/ticket/17433               |     Stopgaps:
   Dependencies:                     |
-------------------------------------+-------------------------------------
Changes (by bhutz):

 * status:  new => needs_review


Comment:

 The fix has the coordinate of the points in the base ring. This was true
 for fields but not for rings (the coordinates of quotient rings were
 lifted). Now it is consistent and this fixes the equality comparison as
 well.

--
Ticket URL: <http://trac.sagemath.org/ticket/17433#comment:4>
Sage <http://www.sagemath.org>
Sage: Creating a Viable Open Source Alternative to Magma, Maple, Mathematica, 
and MATLAB

-- 
You received this message because you are subscribed to the Google Groups 
"sage-trac" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/sage-trac.
For more options, visit https://groups.google.com/d/optout.

Reply via email to