Dirk, when you run a check cycle, do you track the last time each check was run, or 
just the time the last cycle was run? The reason I'm asking is because by DBA here has 
suggested that if you could output in the interchange database the checktime of the 
previous check, we can use that to calculate how long that particular entry was in the 
current state. Thus, calculate the total times for each state.



Michael Shook
Business Continuity Analyst
Saddle Creek Corporation
723 Joe Tamplin Industrial Blvd
Macon GA  31217
478 742 8740 ext. 105 (work)
478 256 9318 (mobile)
478 742 7917 (fax)
[EMAIL PROTECTED] 
http://www.saddlecrk.com

To unsubscribe from a list, send a mail message to [EMAIL PROTECTED]
With the following in the body of the message:
   unsubscribe SAlive

Reply via email to