*Hi Partners,*
**
*Greetings,*
**
*Hope you are doing Well!!!!!!!!!!!!!!!*
**
*Please forward a profiles to
**[email protected]*<[email protected]>
**
*Here are the requirement details*
Location: Oklahoma City, OK
Duration: 1 year with possibility for two - 1 year extensions
Rate: Send best rate possible (competitive bid)
Position: Oracle Consultant
*Individuals need to have demonstrated a history of successful support in an
Oracle environment that includes a thorough understanding of:*
*Oracle job scheduler*
*OEM scheduler*
*Security patch application*
*Oracle Data Guard*
*Windows operating system*
* Standard and Enterprise Edition*
*Oracle 10g and 11g*
*Costs impact associated with platform upgrades*
*Database performance tuning*
*Oracle Forms and Reports*
*Data Capacity needs analysis*
*Oracle Standard and Advance configuration options*
*PC Server Hardware Experience (Dell)*
*Oracle Certification (desired)*
*Symantac*
*WSUS*
Paybase – Oracle database general knowledge not the application
OST is looking for an organization to assist with the task o fimplementing
the Data Guard features of its Oracle application platform. Familiarity
with Oracle database, failover switchover functionality, job scheduler and
Oracle Forms and Reports are essential. Database performance, script
writing for power up and power down is also desirable.
*Goals and Objectives:*
To establish the data integrity between the Production and Test environments
Identify and document the procedures needed for Failover / Switchover
procedures
Utilize the OEM job scheduler for job processing
Implement Oracle security patches
Identify tasks for quarterly performance and security checks.
Knowledge transfer OEM and Failover / Switchover procedures
*Skill set needs:*
Failover / Switchover familiarity
Oracle 10.2.4g // Windows OS
Oracle Data guard functionality
Enterprise Manager database
OEM job scheduling
Oracle Forms and Reports
*Stabilization:*
*Work Steps:*
* *
Backup Post 1
Export Post 1
Remove Post 1 database and Oracle Software
Install 10.2.0.1.0 Oracle Software
Patch Oracle Software to 10.2.0.4.0
Create Post 1 database
Verify installation
Repeat the process for Post 2
On site for post production support 2 days
*Failover / Switchover:*
*General work definition:*
* *
1. Document steps to implement Failover / Switchover process in OST
computing environment
2. Modify 75 OEM jobs to run in Failover configuration environment
a.) Includes elimination of hard code variable
3. Create Program to determine database status: Switchover / Failover
4. Upgrade Enterprise Manager database
5. Identify any new or missing directories outside the Data Guard
function
a.) Approximately 700 directories to examine
6. Test both failover and switchover procedures
7. Document recovery procedures
8. Apply security patches. Approximately two years worth.
9. Recreate test DB (currently out of synch with production DB)
10. Write reboot script for operations
* *
*Deliverables:*
Documents: recovery procedures, failover / switchover
procedures.
*Disaster Recovery:*
* *
OST is working with another agency on the implementation of VMWare, an
application utilized in Disaster Recovery efforts. As the DBA resource
questions on how to best implement this application will be part of the
consulting role. This exercise could include the demonstration of Failover
/ Switch over procedures in order to implement the VMWare functionality.
--
Regards,
Shankar
248-522-6879
Technology consultanst inc
--
You received this message because you are subscribed to the Google Groups "SAP
ABAP" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to
[email protected].
For more options, visit this group at
http://groups.google.com/group/sap-abap?hl=en.