Greetings!!! Please find the below requirements with our client.
If interested, Please forward your consultant updated Resume with the contact details ASAP to *[email protected] <[email protected]>* *Project Manager * *Location: Austin, TX* *Duration: 12 Months* *Note: Travel will be required to different locations of Client Offices.* * Minimum Requirements:* Years Skills/Experience 8 Extensive work experience and understanding of project management life cycle (PMLC) and system development life cycle (SDLC) methodologies. 8 Experience in identifying potential project risks and issues and documenting strategies to accept, mitigate, or avoid. 8 Experience in conducting meetings and/or presentation preparation tasks as needed (e.g., prepare or oversee preparation of and provide agendas and pre-meeting materials as well as follow-up notes, post meeting materials, assignment follow-up and related activities). 8 Experience in MS Office Suite. Strong Must have strong writing, analytical, interpersonal, organizational, and communications skills with project management experience. * Preferences:* Years Skills/Experience 5 Experience working in a state/federal government environment 5 Project Management Professional (PMP) certification. *Task 1. **Work Prioritization:* · Work with PM, SSLC Facilities Director and IT IO Director to prioritize each building within a site based on the number of aggregation points from each building. · Prioritize each SSLC based on the current risk level. · Work with the PM, SSLC Facilities Director and IT IO Director to gather required information to include but not limited to: - Building construction - Detailed building diagrams containing § Size § Construction material § Room placement § Existing cabling - Facility layout including but not limited to: § Building distance § Soil composition § Existing fiber location § Trenching constraints · install Intrusion Prevention System hardware/software to monitor network and/or system activities for security purposes. · Develop 3 site packages containing four SSLCs per package. Each package could be aligned but not limited to: - Geographical location - Number of high, medium, and low priority sites. *Task 2. **Detailed Assessment:* · Identify a representative sample of SSLC sites for the following steps. - Fiber plant assessment at each of the representative sampling of the SSLC sites. - Wireless heat map for Signal penetration at each of the representative sampling of the SSLC sites *Task 3. **Design and Implementation SOW:* · The written approach should require: - Participation of a vendor walk-through of the representative sites · Each approach should include: - A detailed bill of material, - fixed price cost for each of the sites within a package. -- Thanks & Regards, *Pavan Kaparthi | * *Infolob Solutions Inc.| * Direct: 972-212-5659 |Fax: 888-228-4125 | Email:*[email protected] <[email protected]>* |www.infolob.com | *A MBE COMPANY | ORACLE PLATINUM PARTNER COMPANY* -- You received this message because you are subscribed to the Google Groups "American Vendor--IT Consulting" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at http://groups.google.com/group/sap-vendor. For more options, visit https://groups.google.com/groups/opt_out.
