Is there a timetable for the next releases, bug fix and minor? I really must get the D tool updated a bit compared to the current state. The last pull request was rejected for lack of new tests – which is not entirely unreasonable. My problem of the minute though is that it is not clear what the right test structure is for a pull request.
Dirk's "separate tool package" test system works well, but this is not the test framework used by core tools. I guess I am having a "being thick" period and so need some guidance as to how to structure tests to avoid duplication so that a single test suite can work in separate package mode and core mode. Thanks. -- Russel. ============================================================================= Dr Russel Winder t: +44 20 7585 2200 voip: sip:[email protected] 41 Buckmaster Road m: +44 7770 465 077 xmpp: [email protected] London SW11 1EN, UK w: www.russel.org.uk skype: russel_winder
signature.asc
Description: This is a digitally signed message part
_______________________________________________ Scons-dev mailing list [email protected] http://two.pairlist.net/mailman/listinfo/scons-dev
