Re: Product Update

2008-04-08 Thread Flemming Richter Mikkelsen
On 4/7/08, steve [EMAIL PROTECTED] wrote:


 As I explained a while back we had a few milestones to hit before
 beginning
 mass production.
 The First was DVT. Building phones and verifying the design. That's been
 completed and so we have
 Moved onto the next stage PVT. Verifying the design for Production. This
 stage is always a bit annoying
 Because the temptation is to throw the switch and build a billion phones.
 There are three PVT builds scheduled
 And the first has been completed. The completed handsets will be tested
 and
 then we will tweak the process and build two more PVT  batches. It's the
 final push people so everybody keep your good humour.


CONGRATULATIONS!!! Good luck with the PVT!
-- 
Please don't send me Word or PowerPoint attachments. See
http://www.gnu.org/philosophy/no-word-attachments.html

Join the FSF as an Associate Member at:
URL:http://www.fsf.org/register_form?referrer=5774
___
Openmoko community mailing list
community@lists.openmoko.org
http://lists.openmoko.org/mailman/listinfo/community


RE: Product Update

2008-04-07 Thread Crane, Matthew

May the test gods be with you. 

This product will leapfrog the iPod and provide pleasure to all five of
your senses. The user can download pictures, smells, tastes and
celebrity tickling patterns. The test group preferred it over eating.
They're all dead.
It has the coolness factor.
- Dilbert and The Boss 


-Original Message-
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of steve
Sent: Sunday, April 06, 2008 6:44 PM
To: 'List for Openmoko community discussion'
Subject: Product Update

It's the final push people so everybody keep your good humour. 



___
Openmoko community mailing list
community@lists.openmoko.org
http://lists.openmoko.org/mailman/listinfo/community

___
Openmoko community mailing list
community@lists.openmoko.org
http://lists.openmoko.org/mailman/listinfo/community


Re: Product Update

2008-04-06 Thread Tim Kersten
On Sun, Apr 6, 2008 at 11:44 PM, steve [EMAIL PROTECTED] wrote:

   As I explained a while back we had a few milestones to hit before beginning
  mass production.
  The First was DVT. Building phones and verifying the design. That's been
  completed and so we have
  Moved onto the next stage PVT. Verifying the design for Production. This
  stage is always a bit annoying
  Because the temptation is to throw the switch and build a billion phones.
  There are three PVT builds scheduled
  And the first has been completed. The completed handsets will be tested and
  then we will tweak the process and build two more PVT  batches. It's the
  final push people so everybody keep your good humour.



  ___
  Openmoko community mailing list
  community@lists.openmoko.org
  http://lists.openmoko.org/mailman/listinfo/community


Congratulations!!! I'm glad to see things looking so good :-)

-- 
Kind Regards,
Tim

___
Openmoko community mailing list
community@lists.openmoko.org
http://lists.openmoko.org/mailman/listinfo/community


Re: Product Update

2008-04-06 Thread ramsesoriginal
On Mon, Apr 7, 2008 at 12:51 AM, Tim Kersten [EMAIL PROTECTED] wrote:

 On Sun, Apr 6, 2008 at 11:44 PM, steve [EMAIL PROTECTED] wrote:
  
 As I explained a while back we had a few milestones to hit before 
 beginning
mass production.
The First was DVT. Building phones and verifying the design. That's been
completed and so we have
Moved onto the next stage PVT. Verifying the design for Production. This
stage is always a bit annoying
Because the temptation is to throw the switch and build a billion phones.
There are three PVT builds scheduled
And the first has been completed. The completed handsets will be tested 
 and
then we will tweak the process and build two more PVT  batches. It's the
final push people so everybody keep your good humour.
  
  
  
___
Openmoko community mailing list
community@lists.openmoko.org
http://lists.openmoko.org/mailman/listinfo/community
  

  Congratulations!!! I'm glad to see things looking so good :-)

  --
  Kind Regards,
  Tim



  ___
  Openmoko community mailing list
  community@lists.openmoko.org
  http://lists.openmoko.org/mailman/listinfo/community


Congratulations! That's great news, thank you for sharing it with us!

-- 
My corner of the web: http://blog.ramsesoriginal.org

___
Openmoko community mailing list
community@lists.openmoko.org
http://lists.openmoko.org/mailman/listinfo/community


Re: Product Update

2008-04-06 Thread Marco Trevisan (Treviño)

steve ha scritto:

Moved onto the next stage PVT. Verifying the design for Production. This
stage is always a bit annoying
Because the temptation is to throw the switch and build a billion phones.
There are three PVT builds scheduled
And the first has been completed. The completed handsets will be tested and
then we will tweak the process and build two more PVT  batches. It's the
final push people so everybody keep your good humour. 


My humor is more than up, btw how much should these tests last if all 
goes as expected? :P

Thanks!

--