Bug#357337: Unable to change the size of function calls in sequence diagrams

2006-03-16 Thread Thomas Schoepf
package: umbrello
version: 3.5.0
severity: normal

When drawing a sequence diagram sometimes you want to indicate that object A
synchroniously calls object B which synchroniously calls object C which
synchroniously calls object D.
To indicate that the calls B-C and C-D are synchronious whith the call
A-B, the bar on the timeline of object A is long enough to encompass all
the bars on the lifelines of B, C, and D.
But it seems that there is no way to change the length of those bars in
Umbrello. But this would be an essential feature for sequence diagrams.

Thanks,
Thomas

-- 
Bis zu 70% Ihrer Onlinekosten sparen: GMX SmartSurfer!
Kostenlos downloaden: http://www.gmx.net/de/go/smartsurfer

-- 
Bis zu 70% Ihrer Onlinekosten sparen: GMX SmartSurfer!
Kostenlos downloaden: http://www.gmx.net/de/go/smartsurfer


-- 
To UNSUBSCRIBE, email to [EMAIL PROTECTED]
with a subject of unsubscribe. Trouble? Contact [EMAIL PROTECTED]



Bug#357337: Unable to change the size of function calls in sequence diagrams

2006-03-16 Thread Oliver Kellogg
This is a duplicate of http://bugs.kde.org/120910 and has been fixed, see
http://lists.kde.org/?l=kde-commitsm=113855749527955w=2
to appear in KDE 3.5.2 which will be tagged tomorrow.


-- 
To UNSUBSCRIBE, email to [EMAIL PROTECTED]
with a subject of unsubscribe. Trouble? Contact [EMAIL PROTECTED]