Re: Scheduling 9.9

2019-03-25 Thread Adam D. Barratt

On 2019-02-20 18:37, Steve McIntyre wrote:

On Wed, Feb 20, 2019 at 06:28:05PM +, Jonathan Wiltshire wrote:

Hi,

Please indicate your availablility out of:

- April 13
- April 20 (Easter weekend)


I'm away on holiday for both of these, I'm afraid, and so is chief CD
tester Andy.


- April 27


But this works.


My social secretary says the 27th should be fine for me too.

Cheers,

Adam



Re: Scheduling 9.9

2019-03-24 Thread Joerg Jaspert

On 15351 March 1977, Jonathan Wiltshire wrote:

 - April 27


Wfm.

--
bye, Joerg



Re: Scheduling 9.9

2019-03-24 Thread Jonathan Wiltshire
Hi,

On Wed, Feb 20, 2019 at 06:28:05PM +, Jonathan Wiltshire wrote:
> Please indicate your availablility out of:
> 
>  - April 13
>  - April 20 (Easter weekend)
>  - April 27

>From the replies so far I guess at the moment we're looking at the 27th.
Any other inputs?

Thanks,

-- 
Jonathan Wiltshire  j...@debian.org
Debian Developer http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC  74C3 5394 479D D352 4C51



Re: Scheduling 9.9

2019-02-22 Thread Donald Norwood
On 2/20/19 8:05 PM, Cyril Brulebois wrote:
> Steve McIntyre  (2019-02-20):
>> On Wed, Feb 20, 2019 at 06:28:05PM +, Jonathan Wiltshire wrote:
>>> Hi,
>>>
>>> Please indicate your availablility out of:
>>>
>>> - April 13
>>> - April 20 (Easter weekend)
>>
>> I'm away on holiday for both of these, I'm afraid, and so is chief CD
>> tester Andy.
>>
>>> - April 27
>>
>> But this works.
> 
> All dates should be OK for d-i preparations on my side.

Publicity can do the 27th.

-- 
--
⢀⣴⠾⠻⢶⣦⠀
⣾⠁⢠⠒⠀⣿⡁ Donald Norwood
⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174
⠈⠳⣄ D5E9 E5EC 4AC9 BD62 7B05



signature.asc
Description: OpenPGP digital signature


Re: Scheduling 9.9

2019-02-20 Thread Cyril Brulebois
Steve McIntyre  (2019-02-20):
> On Wed, Feb 20, 2019 at 06:28:05PM +, Jonathan Wiltshire wrote:
> >Hi,
> >
> >Please indicate your availablility out of:
> >
> > - April 13
> > - April 20 (Easter weekend)
> 
> I'm away on holiday for both of these, I'm afraid, and so is chief CD
> tester Andy.
> 
> > - April 27
> 
> But this works.

All dates should be OK for d-i preparations on my side.


Cheers,
-- 
Cyril Brulebois (k...@debian.org)
D-I release manager -- Release team member -- Freelance Consultant


signature.asc
Description: PGP signature


Re: Scheduling 9.9

2019-02-20 Thread Steve McIntyre
On Wed, Feb 20, 2019 at 06:28:05PM +, Jonathan Wiltshire wrote:
>Hi,
>
>Please indicate your availablility out of:
>
> - April 13
> - April 20 (Easter weekend)

I'm away on holiday for both of these, I'm afraid, and so is chief CD
tester Andy.

> - April 27

But this works.

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
"Managing a volunteer open source project is a lot like herding
 kittens, except the kittens randomly appear and disappear because they
 have day jobs." -- Matt Mackall


signature.asc
Description: PGP signature


Scheduling 9.9

2019-02-20 Thread Jonathan Wiltshire
Hi,

Please indicate your availablility out of:

 - April 13
 - April 20 (Easter weekend)
 - April 27

Thanks,

--
Jonathan Wiltshire  j...@debian.org
Debian Developer http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC  74C3 5394 479D D352 4C51