[ 
https://issues.apache.org/jira/browse/GEARPUMP-349?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Manu Zhang reassigned GEARPUMP-349:
-----------------------------------

    Assignee: Huafeng Wang

> Graph#topologicalOrderIterator is slow for large graph
> ------------------------------------------------------
>
>                 Key: GEARPUMP-349
>                 URL: https://issues.apache.org/jira/browse/GEARPUMP-349
>             Project: Apache Gearpump
>          Issue Type: Improvement
>          Components: core
>    Affects Versions: 0.8.4
>            Reporter: Manu Zhang
>            Assignee: Huafeng Wang
>             Fix For: 0.8.5
>
>
> The algorithm is as follows
> 1. find zero in-degree nodes from a copied graph. 
> 2. remove nodes from the copied graph and add them to the output
> 3. repeat 1
> The issue is that step 1 traverses all remaining nodes each time, which costs 
> the algorithm {{O(n^2)}} time
> {{Graph#hasCycle}} has a similar issue



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to