Pavan Kumar created GIRAPH-917:
----------------------------------

             Summary: Every commit is followed by ABORTED: Integrated in 
Giraph-trunk-Commit
                 Key: GIRAPH-917
                 URL: https://issues.apache.org/jira/browse/GIRAPH-917
             Project: Giraph
          Issue Type: Task
            Reporter: Pavan Kumar


Currently, every continuous build is aborted, because it is taking too long. 
Shouldn't we reduce the testing time so we can be with in the time limit or 
have a way to increase the time limits.

Would be great if some one from PMC can take a look. This issue has been 
bugging us for very long now. Continuous build has become useless in verifying 
correctness of commit because of this issue.

Thanks.



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to