[jira] [Commented] (HIVE-9226) Beeline interweaves the query result and query log sometimes

2014-12-30 Thread Dong Chen (JIRA)

[ 
https://issues.apache.org/jira/browse/HIVE-9226?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14260928#comment-14260928
 ] 

Dong Chen commented on HIVE-9226:
-

cc [~chengxiang li]

 Beeline interweaves the query result and query log sometimes
 

 Key: HIVE-9226
 URL: https://issues.apache.org/jira/browse/HIVE-9226
 Project: Hive
  Issue Type: Improvement
Reporter: Dong Chen
Assignee: Dong Chen
Priority: Minor
 Attachments: HIVE-9226.patch


 In most case, Beeline output the query log during execution and output the 
 result at last. However, sometimes there are logs output after result, 
 although the query has been done. This might make users a little confused.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (HIVE-9226) Beeline interweaves the query result and query log sometimes

2014-12-30 Thread Hive QA (JIRA)

[ 
https://issues.apache.org/jira/browse/HIVE-9226?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14261010#comment-14261010
 ] 

Hive QA commented on HIVE-9226:
---



{color:red}Overall{color}: -1 at least one tests failed

Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12689457/HIVE-9226.patch

{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 6723 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestMinimrCliDriver.testCliDriver_list_bucket_dml_10
{noformat}

Test results: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/2220/testReport
Console output: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/2220/console
Test logs: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-2220/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12689457 - PreCommit-HIVE-TRUNK-Build

 Beeline interweaves the query result and query log sometimes
 

 Key: HIVE-9226
 URL: https://issues.apache.org/jira/browse/HIVE-9226
 Project: Hive
  Issue Type: Improvement
Reporter: Dong Chen
Assignee: Dong Chen
Priority: Minor
 Attachments: HIVE-9226.patch


 In most case, Beeline output the query log during execution and output the 
 result at last. However, sometimes there are logs output after result, 
 although the query has been done. This might make users a little confused.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (HIVE-9226) Beeline interweaves the query result and query log sometimes

2014-12-30 Thread Brock Noland (JIRA)

[ 
https://issues.apache.org/jira/browse/HIVE-9226?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14261300#comment-14261300
 ] 

Brock Noland commented on HIVE-9226:


+1

 Beeline interweaves the query result and query log sometimes
 

 Key: HIVE-9226
 URL: https://issues.apache.org/jira/browse/HIVE-9226
 Project: Hive
  Issue Type: Improvement
Reporter: Dong Chen
Assignee: Dong Chen
Priority: Minor
 Attachments: HIVE-9226.patch


 In most case, Beeline output the query log during execution and output the 
 result at last. However, sometimes there are logs output after result, 
 although the query has been done. This might make users a little confused.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)