Re: Solr Ref Guide 5.2 RC Planning - aiming for RC0 on 2015-06-01

2015-06-01 Thread Chris Hostetter

FYI: this is currently on hold while we wait for the javadoc shortcut 
links to be updated (i always forget to plan ahead for timing that step)



: Date: Wed, 27 May 2015 09:57:46 -0700 (MST)
: From: Chris Hostetter hossman_luc...@fucit.org
: To: Lucene Dev dev@lucene.apache.org
: Subject: Solr Ref Guide 5.2 RC Planning - aiming for RC0 on 2015-06-01
: 
: 
: I'm volunteering to be the RM for the 5.2 ref guide.
: 
: Now that anshum has started on the 5.2 (code) RC process, we need to knuckle
: down on the ref guide as well.  I'm about to start reviewing  summarizing the
: CHANGES.txt list for notable things that need doc'ed which i'll post on the
: TODO page -- but in the meantime if you've worked on a new Solr feature in
: 5.2, please make sure you've updated the corrisponding page in the ref guide
: -- you shouldn't be waiting until the last minute to do that, this part of the
: process is just about looking for things that have fallen through the cracks.
: 
: My goal is to cut the first ref guide RC no later then monday (2015-06-01) and
: -- as usual -- cancel any ref guide vote that is ongoing if/when a new code RC
: is published tha affects anything in the ref guide.
: 
: 
: 
: -Hoss
: http://www.lucidworks.com/
: 

-Hoss
http://www.lucidworks.com/

-
To unsubscribe, e-mail: dev-unsubscr...@lucene.apache.org
For additional commands, e-mail: dev-h...@lucene.apache.org



Solr Ref Guide 5.2 RC Planning - aiming for RC0 on 2015-06-01

2015-05-27 Thread Chris Hostetter


I'm volunteering to be the RM for the 5.2 ref guide.

Now that anshum has started on the 5.2 (code) RC process, we need to 
knuckle down on the ref guide as well.  I'm about to start reviewing  
summarizing the CHANGES.txt list for notable things that need doc'ed which 
i'll post on the TODO page -- but in the meantime if you've worked on a 
new Solr feature in 5.2, please make sure you've updated the corrisponding 
page in the ref guide -- you shouldn't be waiting until the last minute to 
do that, this part of the process is just about looking for things that 
have fallen through the cracks.


My goal is to cut the first ref guide RC no later then monday (2015-06-01) 
and -- as usual -- cancel any ref guide vote that is ongoing if/when a 
new code RC is published tha affects anything in the ref guide.




-Hoss
http://www.lucidworks.com/

-
To unsubscribe, e-mail: dev-unsubscr...@lucene.apache.org
For additional commands, e-mail: dev-h...@lucene.apache.org