Re: [Dev] Changing the Developer Studio 3.2.1 milestone plan

2013-08-08 Thread Samisa Abeysinghe
I have done the version changes in Jira. Can someone please update RM?


On Tue, Aug 6, 2013 at 5:54 PM, Samisa Abeysinghe sam...@wso2.com wrote:

 +1 for version change, as we will change the look and feel. It is not a
 mere bug fix any more.

 We had to change the look and feel, in the process of addressing some
 usability issues.

 Though the number changes, we still can stick to the milestone plan.

 One concern is the connector POC is lagging. We might have to release
 Viraj a bit to get cracking on that too, after this week.


 On Tue, Aug 6, 2013 at 3:03 PM, Jasintha Dasanayake jasin...@wso2.comwrote:

 HI

 Well, IMO Once We complete the ESB graphical editor look and feel(new
 milestone 2.and 3 )  DevS 3.3.0 should be released instead of 3.2.1, after
 that we can do a 3.3.1 bug fixes release and rest of the fixes(which have
 been scheduled for milestone 4 and 5) can be include into 3.3.1

 BTW 3.2.1 has been scheduled on 8 th of Aug this also impossible

 WDYT ?

 Thanks and Regards
 /Jasintha




 On Tue, Aug 6, 2013 at 11:19 AM, Asanka Sanjeewa asan...@wso2.comwrote:

 Hi,

 We have changed the Developer Studio milestone plan for 3.2.1 bit. We
 are going to give high priority for the issues related to usability of the
 ESB graphical editor and look and feel of the editor. So those issues will
 be fixed in milestone 2 and 3 although they were scheduled to milestone 4
 and 5 earlier.

 Thanks and Regards,
 AsankaS.

 --
 *Asanka Sanjeewa*
 Senior Software Engineer
 Mobile: +94772532924
 WSO2 Inc. http://wso2.com/
 Blog: http://asanka-tech-blog.blogspot.com/


 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




 --
 *Jasintha Dasanayake
 **Software Engineer
 WSO2 Inc. | http://wso2.com
 lean . enterprise . middleware*
 *
 *
 *mobile :- 077 291 6596*




 --

 Thanks,
 Samisa...

 Samisa Abeysinghe
 VP Engineering
 WSO2 Inc.
 http://wso2.com
 http://wso2.org




-- 

Thanks,
Samisa...

Samisa Abeysinghe
VP Engineering
WSO2 Inc.
http://wso2.com
http://wso2.org
___
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev


Re: [Dev] Changing the Developer Studio 3.2.1 milestone plan

2013-08-08 Thread Viraj Rajaguru
Will update the RM.


Thanks,
Viraj.


On Fri, Aug 9, 2013 at 8:06 AM, Samisa Abeysinghe sam...@wso2.com wrote:

 I have done the version changes in Jira. Can someone please update RM?


 On Tue, Aug 6, 2013 at 5:54 PM, Samisa Abeysinghe sam...@wso2.com wrote:

 +1 for version change, as we will change the look and feel. It is not a
 mere bug fix any more.

 We had to change the look and feel, in the process of addressing some
 usability issues.

 Though the number changes, we still can stick to the milestone plan.

 One concern is the connector POC is lagging. We might have to release
 Viraj a bit to get cracking on that too, after this week.


 On Tue, Aug 6, 2013 at 3:03 PM, Jasintha Dasanayake jasin...@wso2.comwrote:

 HI

 Well, IMO Once We complete the ESB graphical editor look and feel(new
 milestone 2.and 3 )  DevS 3.3.0 should be released instead of 3.2.1, after
 that we can do a 3.3.1 bug fixes release and rest of the fixes(which have
 been scheduled for milestone 4 and 5) can be include into 3.3.1

 BTW 3.2.1 has been scheduled on 8 th of Aug this also impossible

 WDYT ?

 Thanks and Regards
 /Jasintha




 On Tue, Aug 6, 2013 at 11:19 AM, Asanka Sanjeewa asan...@wso2.comwrote:

 Hi,

 We have changed the Developer Studio milestone plan for 3.2.1 bit. We
 are going to give high priority for the issues related to usability of the
 ESB graphical editor and look and feel of the editor. So those issues will
 be fixed in milestone 2 and 3 although they were scheduled to milestone 4
 and 5 earlier.

 Thanks and Regards,
 AsankaS.

 --
 *Asanka Sanjeewa*
 Senior Software Engineer
 Mobile: +94772532924
 WSO2 Inc. http://wso2.com/
 Blog: http://asanka-tech-blog.blogspot.com/


 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




 --
 *Jasintha Dasanayake
 **Software Engineer
 WSO2 Inc. | http://wso2.com
 lean . enterprise . middleware*
 *
 *
 *mobile :- 077 291 6596*




 --

 Thanks,
 Samisa...

 Samisa Abeysinghe
 VP Engineering
 WSO2 Inc.
 http://wso2.com
 http://wso2.org




 --

 Thanks,
 Samisa...

 Samisa Abeysinghe
 VP Engineering
 WSO2 Inc.
 http://wso2.com
 http://wso2.org

 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




-- 
Viraj Rajaguru
Software Engineer
WSO2 Inc. : http://wso2.com

Mobile: +94 77 3683068
___
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev


Re: [Dev] Changing the Developer Studio 3.2.1 milestone plan

2013-08-08 Thread Jasintha Dasanayake
done
/Jasinta


On Fri, Aug 9, 2013 at 8:44 AM, Viraj Rajaguru vi...@wso2.com wrote:

 Will update the RM.


 Thanks,
 Viraj.


 On Fri, Aug 9, 2013 at 8:06 AM, Samisa Abeysinghe sam...@wso2.com wrote:

 I have done the version changes in Jira. Can someone please update RM?


 On Tue, Aug 6, 2013 at 5:54 PM, Samisa Abeysinghe sam...@wso2.comwrote:

 +1 for version change, as we will change the look and feel. It is not a
 mere bug fix any more.

 We had to change the look and feel, in the process of addressing some
 usability issues.

 Though the number changes, we still can stick to the milestone plan.

 One concern is the connector POC is lagging. We might have to release
 Viraj a bit to get cracking on that too, after this week.


 On Tue, Aug 6, 2013 at 3:03 PM, Jasintha Dasanayake 
 jasin...@wso2.comwrote:

 HI

 Well, IMO Once We complete the ESB graphical editor look and feel(new
 milestone 2.and 3 )  DevS 3.3.0 should be released instead of 3.2.1, after
 that we can do a 3.3.1 bug fixes release and rest of the fixes(which have
 been scheduled for milestone 4 and 5) can be include into 3.3.1

 BTW 3.2.1 has been scheduled on 8 th of Aug this also impossible

 WDYT ?

 Thanks and Regards
 /Jasintha




 On Tue, Aug 6, 2013 at 11:19 AM, Asanka Sanjeewa asan...@wso2.comwrote:

 Hi,

 We have changed the Developer Studio milestone plan for 3.2.1 bit. We
 are going to give high priority for the issues related to usability of the
 ESB graphical editor and look and feel of the editor. So those issues will
 be fixed in milestone 2 and 3 although they were scheduled to milestone 4
 and 5 earlier.

 Thanks and Regards,
 AsankaS.

 --
 *Asanka Sanjeewa*
 Senior Software Engineer
 Mobile: +94772532924
 WSO2 Inc. http://wso2.com/
 Blog: http://asanka-tech-blog.blogspot.com/


 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




 --
 *Jasintha Dasanayake
 **Software Engineer
 WSO2 Inc. | http://wso2.com
 lean . enterprise . middleware*
 *
 *
 *mobile :- 077 291 6596*




 --

 Thanks,
 Samisa...

 Samisa Abeysinghe
 VP Engineering
 WSO2 Inc.
 http://wso2.com
 http://wso2.org




 --

 Thanks,
 Samisa...

 Samisa Abeysinghe
 VP Engineering
 WSO2 Inc.
 http://wso2.com
 http://wso2.org

 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




 --
 Viraj Rajaguru
 Software Engineer
 WSO2 Inc. : http://wso2.com

 Mobile: +94 77 3683068






-- 
*Jasintha Dasanayake
**Software Engineer
WSO2 Inc. | http://wso2.com
lean . enterprise . middleware*
*
*
*mobile :- 077 291 6596*
___
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev


Re: [Dev] Changing the Developer Studio 3.2.1 milestone plan

2013-08-06 Thread Jasintha Dasanayake
HI

Well, IMO Once We complete the ESB graphical editor look and feel(new
milestone 2.and 3 )  DevS 3.3.0 should be released instead of 3.2.1, after
that we can do a 3.3.1 bug fixes release and rest of the fixes(which have
been scheduled for milestone 4 and 5) can be include into 3.3.1

BTW 3.2.1 has been scheduled on 8 th of Aug this also impossible

WDYT ?

Thanks and Regards
/Jasintha




On Tue, Aug 6, 2013 at 11:19 AM, Asanka Sanjeewa asan...@wso2.com wrote:

 Hi,

 We have changed the Developer Studio milestone plan for 3.2.1 bit. We are
 going to give high priority for the issues related to usability of the ESB
 graphical editor and look and feel of the editor. So those issues will be
 fixed in milestone 2 and 3 although they were scheduled to milestone 4 and
 5 earlier.

 Thanks and Regards,
 AsankaS.

 --
 *Asanka Sanjeewa*
 Senior Software Engineer
 Mobile: +94772532924
 WSO2 Inc. http://wso2.com/
 Blog: http://asanka-tech-blog.blogspot.com/


 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




-- 
*Jasintha Dasanayake
**Software Engineer
WSO2 Inc. | http://wso2.com
lean . enterprise . middleware*
*
*
*mobile :- 077 291 6596*
___
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev


Re: [Dev] Changing the Developer Studio 3.2.1 milestone plan

2013-08-06 Thread Samisa Abeysinghe
+1 for version change, as we will change the look and feel. It is not a
mere bug fix any more.

We had to change the look and feel, in the process of addressing some
usability issues.

Though the number changes, we still can stick to the milestone plan.

One concern is the connector POC is lagging. We might have to release Viraj
a bit to get cracking on that too, after this week.


On Tue, Aug 6, 2013 at 3:03 PM, Jasintha Dasanayake jasin...@wso2.comwrote:

 HI

 Well, IMO Once We complete the ESB graphical editor look and feel(new
 milestone 2.and 3 )  DevS 3.3.0 should be released instead of 3.2.1, after
 that we can do a 3.3.1 bug fixes release and rest of the fixes(which have
 been scheduled for milestone 4 and 5) can be include into 3.3.1

 BTW 3.2.1 has been scheduled on 8 th of Aug this also impossible

 WDYT ?

 Thanks and Regards
 /Jasintha




 On Tue, Aug 6, 2013 at 11:19 AM, Asanka Sanjeewa asan...@wso2.com wrote:

 Hi,

 We have changed the Developer Studio milestone plan for 3.2.1 bit. We are
 going to give high priority for the issues related to usability of the ESB
 graphical editor and look and feel of the editor. So those issues will be
 fixed in milestone 2 and 3 although they were scheduled to milestone 4 and
 5 earlier.

 Thanks and Regards,
 AsankaS.

 --
 *Asanka Sanjeewa*
 Senior Software Engineer
 Mobile: +94772532924
 WSO2 Inc. http://wso2.com/
 Blog: http://asanka-tech-blog.blogspot.com/


 ___
 Dev mailing list
 Dev@wso2.org
 http://wso2.org/cgi-bin/mailman/listinfo/dev




 --
 *Jasintha Dasanayake
 **Software Engineer
 WSO2 Inc. | http://wso2.com
 lean . enterprise . middleware*
 *
 *
 *mobile :- 077 291 6596*




-- 

Thanks,
Samisa...

Samisa Abeysinghe
VP Engineering
WSO2 Inc.
http://wso2.com
http://wso2.org
___
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev


[Dev] Changing the Developer Studio 3.2.1 milestone plan

2013-08-05 Thread Asanka Sanjeewa
Hi,

We have changed the Developer Studio milestone plan for 3.2.1 bit. We are
going to give high priority for the issues related to usability of the ESB
graphical editor and look and feel of the editor. So those issues will be
fixed in milestone 2 and 3 although they were scheduled to milestone 4 and
5 earlier.

Thanks and Regards,
AsankaS.

-- 
*Asanka Sanjeewa*
Senior Software Engineer
Mobile: +94772532924
WSO2 Inc. http://wso2.com/
Blog: http://asanka-tech-blog.blogspot.com/
___
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev