[Elecraft] Kit Building estimated Times: KX1, W2, P3

2010-07-17 Thread Phil Hystad
I have two kits right now and a third (the P3) on the way soon (I hope).  I got 
the KX1 to replace my Norcal 40A QRP rig and I just got (yesterday) the W2 to 
add to my growing collection of SWR meters.

My plan is to do the P3 first.  So, I am waiting until the P3 arrives.  But, I 
am thinking that maybe I can whip out the W2 pretty quickly.  Therefore, can 
anyone give me an estimate of what I should expect on the W2 build time?

I got estimates here for the K3/100 when I got that and my build time came 
right near the average of those values reported by various peoples (8 1/2 
hours).

So, I know that the P3 build time is probably not known by anyone other then 
beta kit builders.  How about the average build times for the W2-kit (one 
coupler) and the KX1 kit (toroids done by the Toroid Guy, already here).

73, phil, K7PEH

__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html


Re: [Elecraft] Kit Building estimated Times: KX1, W2, P3

2010-07-17 Thread Don Cunningham
Phil,
The W2 is a VERY easy build, and took me less than an hour and a half, and I 
work slowly to avoid mistakes, hi.   The build was done during the latter 
part of a rest break building the K3 for me and it worked fine, first 
time!!  I too am ANXIOUSLY awaiting my P3
73,
Don, WB5HAK 

__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html


Re: [Elecraft] Kit Building estimated Times: KX1, W2, P3

2010-07-17 Thread Don Wilhelm
Phil,

Well, after building a LOT of KX1s (I've lost count), I can complete the 
KX1, KXB3080, and KXAT1 in about 12 hours at the workbench.  But 
consider that I no longer read all the detail in the manual - I only use 
it as a guide in the order in which to place the parts (do not try to 
second guess that order).  For the first time through a KX1 build, I 
would estimate double the time it takes me, so somewhere in the range of 
20 to 25 hours should be about right.

I have not yet built a W2, so no answer on that.

73,
Don W3FPR

Phil Hystad wrote:
 I have two kits right now and a third (the P3) on the way soon (I hope).  I 
 got the KX1 to replace my Norcal 40A QRP rig and I just got (yesterday) the 
 W2 to add to my growing collection of SWR meters.

 My plan is to do the P3 first.  So, I am waiting until the P3 arrives.  But, 
 I am thinking that maybe I can whip out the W2 pretty quickly.  Therefore, 
 can anyone give me an estimate of what I should expect on the W2 build time?

 I got estimates here for the K3/100 when I got that and my build time came 
 right near the average of those values reported by various peoples (8 1/2 
 hours).

 So, I know that the P3 build time is probably not known by anyone other then 
 beta kit builders.  How about the average build times for the W2-kit (one 
 coupler) and the KX1 kit (toroids done by the Toroid Guy, already here).

 73, phil, K7PEH

 __
 Elecraft mailing list
 Home: http://mailman.qth.net/mailman/listinfo/elecraft
 Help: http://mailman.qth.net/mmfaq.htm
 Post: mailto:Elecraft@mailman.qth.net

 This list hosted by: http://www.qsl.net
 Please help support this email list: http://www.qsl.net/donate.html

   
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html