Re: [go-cd] Rollback deployment method

2023-08-04 Thread Vijayakumaran A.
hi Thanks for the reply,actually we are new to gocd and we have simple two
pipelines as of now.

pipeline one for java application with two stages:

Stage 1 : build stage using maven
Stage 2 : copy the build war file to tomcat directory. (cp *.war
/opt/tomcat/webapp)

Another pipeline for php whenever developers push their code gocd
automatically triggered in this pipeline we have only one stage.

stage: cd /path/to/phpdirectory && git pull

When I use trigger with option to run the pipeline with specific commit it
only runs that commit changes in go-agent home
path /usr/share/go-agent/lib/pipelines/pipelinename not in
/path/to/phpdirectory

Please help us to rollback the method for the above scenario.



On Fri, Aug 4, 2023 at 11:51 AM Chad Wilson  wrote:

> It depends on the tooling you are using and what environment/stack you are
> deploying to, alongside artifact storage relevant to your deployments.
>
> Not all deployments can be rolled back without extra effort in tooling or
> application design (e.g how will you roll back a DROP TABLE for a database?
> Do you have rollback scripts that need to be invoked? Do you use DB
> snapshots pre-deploy?)
>
> GoCD isn't opinionated about this.
>
> If you are using a declarative deployment tool or approach you can
> sometimes trigger a re-run of the previous successful deployment's pipeline
> instance/stage. Sometimes teams will roll forward (from a GoCD perspective)
> by initialising a new pipeline run and populating some environment variable
> to override the artifact versions to deploy. Or use a manual 'rollback'
> stage in the same pipeline as the normal deploy.
>
> As with most other pipeline automation approaches, all of these things
> depend on your target platform, tooling and application design.
>
> https://www.gocd.org/2017/06/20/hotfixes-rollback-rollforward.html may be
> useful alongside the wider series at
> https://www.gocd.org/tags/modeling-deployment-pipelines.html
>
> -Chad
>
> On Fri, 4 Aug 2023, 13:58 Vijayakumaran A., <
> vijayakumara...@praniontech.com> wrote:
>
>> Hi Team,
>>
>> How to rollback to the previous deployment. Please any one share any
>> ideas/Docs to refer.
>>
>> --
>> You received this message because you are subscribed to the Google Groups
>> "go-cd" group.
>> To unsubscribe from this group and stop receiving emails from it, send an
>> email to go-cd+unsubscr...@googlegroups.com.
>> To view this discussion on the web visit
>> https://groups.google.com/d/msgid/go-cd/933926d9-2ac7-4a34-b994-98a0f9a12c7an%40googlegroups.com
>> 
>> .
>>
> --
> You received this message because you are subscribed to a topic in the
> Google Groups "go-cd" group.
> To unsubscribe from this topic, visit
> https://groups.google.com/d/topic/go-cd/eqYdAKivhi0/unsubscribe.
> To unsubscribe from this group and all its topics, send an email to
> go-cd+unsubscr...@googlegroups.com.
> To view this discussion on the web visit
> https://groups.google.com/d/msgid/go-cd/CAA1RwH-gG18mKgqeUMkSz3NYwoHTe%2BWsb0ckSsB4uiPSt003AQ%40mail.gmail.com
> 
> .
>


-- 

[image: Email Signature.png]

*VIJAYAKUMARAN A *

*Technical Operations Engineer *
+919788372454

*vijayakumara...@praniontech.com *

http://www.praniontech.com

-- 
You received this message because you are subscribed to the Google Groups 
"go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to go-cd+unsubscr...@googlegroups.com.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/go-cd/CAMpsvH3y6TXs63JvVQKoS2UTFstU4Z%3DjgATz-cN0DP8HRdGRnQ%40mail.gmail.com.


Re: [go-cd] Rollback deployment method

2023-08-04 Thread Chad Wilson
It depends on the tooling you are using and what environment/stack you are
deploying to, alongside artifact storage relevant to your deployments.

Not all deployments can be rolled back without extra effort in tooling or
application design (e.g how will you roll back a DROP TABLE for a database?
Do you have rollback scripts that need to be invoked? Do you use DB
snapshots pre-deploy?)

GoCD isn't opinionated about this.

If you are using a declarative deployment tool or approach you can
sometimes trigger a re-run of the previous successful deployment's pipeline
instance/stage. Sometimes teams will roll forward (from a GoCD perspective)
by initialising a new pipeline run and populating some environment variable
to override the artifact versions to deploy. Or use a manual 'rollback'
stage in the same pipeline as the normal deploy.

As with most other pipeline automation approaches, all of these things
depend on your target platform, tooling and application design.

https://www.gocd.org/2017/06/20/hotfixes-rollback-rollforward.html may be
useful alongside the wider series at
https://www.gocd.org/tags/modeling-deployment-pipelines.html

-Chad

On Fri, 4 Aug 2023, 13:58 Vijayakumaran A., 
wrote:

> Hi Team,
>
> How to rollback to the previous deployment. Please any one share any
> ideas/Docs to refer.
>
> --
> You received this message because you are subscribed to the Google Groups
> "go-cd" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to go-cd+unsubscr...@googlegroups.com.
> To view this discussion on the web visit
> https://groups.google.com/d/msgid/go-cd/933926d9-2ac7-4a34-b994-98a0f9a12c7an%40googlegroups.com
> 
> .
>

-- 
You received this message because you are subscribed to the Google Groups 
"go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to go-cd+unsubscr...@googlegroups.com.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/go-cd/CAA1RwH-gG18mKgqeUMkSz3NYwoHTe%2BWsb0ckSsB4uiPSt003AQ%40mail.gmail.com.