Re: CF Structure Sizing
Dear Barbara, Thank you very much for your reply. Only this one IMS structure failing. X'B400' in size of the structure is : size() The latest changes we upgrade our CF from z9 to z10. (2094 to 2097) 2011-04-11 Thanks and Regards, Mohd Shahrifuddin Ahmad Masri, Room 209, Zhongchen Building, Wangjing Technology Park, Chaoyang District, Beijing, 100102, P.R.China Tel:+86-10-64391733 Fax:+86-10-64391582 Mobile:+86-18621011909 E-mail:fud...@bayss.com http://www.bayss.com 发件人: Barbara Nitz 发送时间: 2011-04-11 13:32:58 收件人: IBM-MAIN 抄送: 主题: Re: CF Structure Sizing Before increase DFS2824A AREA DCMTVD01 CONNECT TO STR: IMS_XXX01A FAILED. 4K B LKS REQUIRED =0CE00, ALLOCATED=01A00 after increase DFS2824A AREA DCMTVD01 CONNECT TO STR: IMS_XXX01A FAILED. 4K B LKS REQUIRED =0CE00, ALLOCATED=01300 before: SIZE(21) After: SIZE(40) Use the CFsizer here: http://www-947.ibm.com/systems/support/z/cfsizer/ims/ You don't supply which of the many IMS structures is actually failing, but the message is telling you that it needs x'CE00' 4k blocks. Not quite doubling the size (as you've done), gave you 700 more blocks. You need x'B400' more blocks, so increase accordingly. This is a substantial increase in size. Did it work before? If so, what has changed? Regards, Barbara Nitz -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html - No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1209 / Virus Database: 1500/3564 - Release Date: 04/10/11
CF Structure Sizing
Dear Listers, I face a problem to determined our structure size. Today our structure is required size is bigger than allocated. I increase double of my current size but not help. Below some information may be can help me to analyst and calculate how big size do I need. Problem: Before increase DFS2824A AREA DCMTVD01 CONNECT TO STR: IMS_XXX01A FAILED. 4K B + LKS REQUIRED =0CE00, ALLOCATED=01A00 after increase STRUCTURE IMS_XXX01A, CONNECTOR NAME IX15 CFNAME ALLOCATION STATUS/FAILURE REASON XX021E STRUCTURE ALLOCATED A8007800 DFS000I MESSAGE(S) FROM ID=IX15 791 DFS2824A AREA DCMTVD01 CONNECT TO STR: IMS_XXX01A FAILED. 4K B + LKS REQUIRED =0CE00, ALLOCATED=01300 My definition: before STRUCTURE NAME(IMS_XXX01A) SIZE(21) After STRUCTURE NAME(IMS_XXX01A) SIZE(40) Any help. Thanks in advance. 2011-04-11 Thanks and Regards, -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Re: Batch loop in SYSplex
DCCB62SA DSP-PSW. 071C0030 851E57AE TCB. 009C8E88 MODN SVC-RES R15. R0.. 03DA4BDF R1.. 7DF84F28 GMT-11/01/2010 02:27:25.133563 LOC-11/01/2010 10:27:25.133563 SVCR 119 ASCB 00F9C900 CPU. JOBN DCGL010D DSP-PSW. 071C0077 851E4554 TCB. 009C8E88 MODN SVC-RES R15. 0004 R0.. R1.. 00FF590A GMT-11/01/2010 02:27:25.133564 LOC-11/01/2010 10:27:25.133564 SVC. 120 ASCB 00F9C600 CPU. 0001 JOBNAME. DCCB62SA OLD-PSW. 071C0078 851E5C02 TCB. 009C8E88 MODN SVC-RES R15. E603 R0.. 030C R1.. 009C7CF0 GMT-11/01/2010 02:27:25.133565 LOC-11/01/2010 10:27:25.133565 SVCR 120 ASCB 00F9C600 CPU. 0001 JOBN DCCB62SA DSP-PSW. 071C0078 851E5C02 TCB. 009C8E88 MODN SVC-RES R15. R0.. 030C R1.. 009C7CF0 GMT-11/01/2010 02:27:25.133569 LOC-11/01/2010 10:27:25.133569 SVC. 056 ASCB 00F9C900 CPU. JOBNAME. DCGL010D OLD-PSW. 071C0038 851E517A TCB. 009C8E88 MODN SVC-RES R15. R0.. R1.. 7F6BE604 PLIST... C0064000 051E63EA 7F6BE458 MAJOR... SYSZTIOT MINOR... 00AE009D 4FC8 GMT-11/01/2010 02:27:25.133569 LOC-11/01/2010 10:27:25.133569 SVC. 120 ASCB 00F9C600 CPU. 0001 JOBNAME. DCCB62SA OLD-PSW. 071C0078 851E5D4C TCB. 009C8E88 MODN SVC-RES R15. E603 R0.. 9000 R1.. 7F6B6000 GMT-11/01/2010 02:27:25.133573 LOC-11/01/2010 10:27:25.133573 SVCR 056 ASCB 00F9C900 CPU. JOBN DCGL010D DSP-PSW. 071C0038 851E517A TCB. 009C8E88 MODN SVC-RES R15. R0.. 03D4A569 R1.. 7E061F28 GMT-11/01/2010 02:27:25.133575 LOC-11/01/2010 10:27:25.133575 SVCR 120 ASCB 00F9C600 CPU. 0001 JOBN DCCB62SA DSP-PSW. 071C0078 851E5D4C TCB. 009C8E88 MODN SVC-RES R15. R0.. 9000 R1.. 7F6B6000 GMT-11/01/2010 02:27:25.133581 LOC-11/01/2010 10:27:25.133581 SVCR 120 ASCB 00F9C600 CPU. 0001 JOBN DCCB62SA DSP-PSW. 078D0078 9760 TCB. 009C8E88 MODN GJBSRVRC R15. 0004 R0.. 0410 R1.. 7F6B6000 2010-11-01 Thanks and Regards, Mohd Shahrifuddin Ahmad Masri, Room 209, Zhongchen Building, Wangjing Technology Park, Chaoyang District, Beijing, 100102, P.R.China Tel:+86-10-64391733 Fax:+86-10-64391582 Mobile:+86-13661994544 E-mail:fud...@bayss.com http://www.bayss.com 发件人: Vernooij, CP - SPLXM 发送时间: 2010-10-11 22:19:01 收件人: IBM-MAIN 抄送: 主题: Re: Batch loop in SYSplex Bob Shannon bshan...@rocketsoftware.com wrote in message news:58fc7f986fcb804286e23b59decf420f0887e...@nwt-s-mbx2.rocketsoftware .com... If it's unsupported where did he get the RSU? And is there a more current RSU that he can get from the same source? One can order maintenance for unsupported releases, one just can't open problems. Bob Shannon Well, one can open new problems and get support if a solution is available, only new
Re: Batch loop in SYSplex
Dear Brian, Thank you. I will give the anwser soon I get all the information you list. Here is out GTFPARM probably this is the default parm. If we need to add more option: TRACE=SYSM,USR,TRC,DSP,PCI,SRM Thanks and regards, Mohd Shahrifuddin ???:Brian Westerman :2010-10-12 14:13:58 ???:IBM-MAIN ??: ??:Re: Batch loop in SYSplex Okay, This shouldn't be too difficult to determine. first, when you notice the HIGH CPU, what other address spaces are also showing HIGH CPU, there will probably be at least one. second, can you check your RMF III reports and see if there are any enqueues at the time, and who they are for I would be most intrested in contention for SYSZIGW3 IGWSHC02 resources if they exist (if so I have your answer). third, Have you discovered what actual programs are involved at the time, is this a standard IDCAMS job or is it a user written program of some sort that is performing the functions. I'm not sure about your expertise level, but the next step (if nothing came out of the above questions) would be a GTF trace so that we can see what we are doing. Depending on the answers to the above, you should be able to code, or I could give you the parms necessary to perform the trace. If you are familiar with using the trace results then you're golden and the cause should be relatively easy to find (a fix might be a little more difficult). I'm fairly certain that I have seen your problem before. let me know what your results are to the above. Brian Westerman -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Re: Batch loop in SYSplex
Thanks Brian for your reply, SDSF Status show using alot of CPU. The job only do VSAM Delete Define. The job we need to cancel to end and CPU % drop and then we submit the same job using LPAR A, the job running successfully and no delay (immediately completed). We display d r,r no any outstanding reply. 2010-10-11 Thanks and regards, ???:Brian Westerman :2010-10-11 14:44:27 ???:IBM-MAIN ??: ??:Re: Batch loop in SYSplex Is the job spinning along using a lot of CPU, or just sitting there waiting on something? BRian -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Re: Batch loop in SYSplex
Dear Terry and others, Thank you very much to answer my question. Is this a one off event or have you had several times? I can say everytime we submit the VSAM delete define job. Is it always the same job? Not same job several delete define VSAM file What sort of VSAM dataset is it? How big is it? KSDS VSAM file. Not big only 1 track record only 1 or 2 records. Do you have RACF erase on scratch turned on for it? If so, and the data set is big, the delete will take a long time writing binary zeros over it. ERASE-ON-SCRATCH IS INACTIVE 2010-10-12 Thanks and regards, Mohd Shahrifuddin Bayshore Consulting and Services, Room 209, Zhongchen Building, Wangjing Technology Park, Chaoyang District, Beijing, 100102, P.R. China Tel: +861064391733 Fax: +861064391582 Mobile: +8613661994544 Email: fud...@bayss.com Web: www.bayss.com ???:Terry Draper :2010-10-11 21:13:56 ???:IBM-MAIN ??: ??:Re: Batch loop in SYSplex Mohd, Just some basic questions. Is this a one off event or have you had several times? Is it always the same job? What sort of VSAM dataset is it? How big is it? Do you have RACF erase on scratch turned on for it? If so, and the data set is big, the delete will take a long time writing binary zeros over it. Terry Draper zSeries Performance Consultant w...@btopenworld.com mobile: +66 811431287 --- On Mon, 11/10/10, Mohd Shahrifuddin fud...@bayss.com wrote: From: Mohd Shahrifuddin fud...@bayss.com Subject: Batch loop in SYSplex To: IBM-MAIN@bama.ua.edu Date: Monday, 11 October, 2010, 2:57 Dear All, Environment: We in z/OS 1.9, CICS, IMS and VSAM environment. Running Parallel SYSPLEX 4 LPAR. Lately we apply new PTF RSU1006 for all three(z/OS,IMS and CICS). Encounter Problem: We have using our own develop Job Schedule running in LPAR A. Our Batch job we route to running in LPAR B. IMS is Sharing all LPAR. Before PTF we not encounter any problem but after complete rooling IPL all LPAR we encounter problem. The problem is the batch job running in LPAR B cannot complete just only to delete define VSAM file. The worst the job using alot of CPU look like loop job. If we run the batch job using the same LPAR (LPAR A) with the job schedule is not encounter any problem. Help: If any of lister face same problem please advice us what the problem. If any cause PTF make the situation problem. Thank You in advance, Mohd Shahrifuddin. Shanghai, China. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Batch loop in SYSplex
Dear All, Environment: We in z/OS 1.9, CICS, IMS and VSAM environment. Running Parallel SYSPLEX 4 LPAR. Lately we apply new PTF RSU1006 for all three(z/OS,IMS and CICS). Encounter Problem: We have using our own develop Job Schedule running in LPAR A. Our Batch job we route to running in LPAR B. IMS is Sharing all LPAR. Before PTF we not encounter any problem but after complete rooling IPL all LPAR we encounter problem. The problem is the batch job running in LPAR B cannot complete just only to delete define VSAM file. The worst the job using alot of CPU look like loop job. If we run the batch job using the same LPAR (LPAR A) with the job schedule is not encounter any problem. Help: If any of lister face same problem please advice us what the problem. If any cause PTF make the situation problem. Thank You in advance, Mohd Shahrifuddin. Shanghai, China. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Re: Batch loop in SYSplex
Thanks Mike for Reply, Not seen catalog is expanding suddenly. Tracks %Used XT CAT..XXX 300? 1 2010-10-11 Thanks and regards, ???:Mike Schwab :2010-10-11 12:21:36 ???:IBM-MAIN ??: ??:Re: Batch loop in SYSplex How about the catalog? Did it expand suddendly? On Sun, Oct 10, 2010 at 8:57 PM, Mohd Shahrifuddin fud...@bayss.com wrote: Dear All, Environment: We in z/OS 1.9, CICS, IMS and VSAM environment. Running Parallel SYSPLEX 4 LPAR. Lately we apply new PTF RSU1006 for all three(z/OS,IMS and CICS). Encounter Problem: We have using our own develop Job Schedule running in LPAR A. Our Batch job we route to running in LPAR B. IMS is Sharing all LPAR. Before PTF we not encounter any problem but after complete rooling IPL all LPAR we encounter problem. The problem is the batch job running in LPAR B cannot complete just only to delete define VSAM file. The worst the job using alot of CPU look like loop job. If we run the batch job using the same LPAR (LPAR A) with the job schedule is not encounter any problem. Help: If any of lister face same problem please advice us what the problem. If any cause PTF make the situation problem. Thank You in advance, Mohd Shahrifuddin. Shanghai, China. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- Mike A Schwab, Springfield IL USA Where do Forest Rangers go to get away from it all? -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Deactivate/inactivate LPAR DEV cause TCPIP PROD hang
Dear All, Operating System OS390 2.10 machine type 9672-R16 define 2 LPAR one production and one development Share OSA card different IP address During Deactivation and Activation the development system and IPL we found the TCPIP in Production is hang. No connection between our production system and our Unix system. The problem no message in SYSLOG, TCPIP address space or Unix system. Please help if anybody have same problem before. Thanks and appreciated so much. Mohd Shahrifuddin ShenZhen, China -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Re: DEFINING USERCAT WITH GUARANTEED SPACE
Dear Esmie, What not using export/import to move the user catalog to new volume. Make sure to disable the current volume to ensure the new catalog not reside to the same volume. The new volume must be added to the storagegroup. If you like to guarantee space define the usercat to sms routine to DClass guarantee space. This is must easier. Below I copy the JCL. Happy try. //EXPCATLG JOB (SDB-SYSP),CLASS=A,MSGCLASS=X,MSGLEVEL=(1,1), // NOTIFY=SYSUID //* // //* EXAMPLE OF HOW TO EXPORT ICF CATALOG (TEMPORARY) * // //* //EXPORTEXEC PGM=IDCAMS //SYSPRINT DD SYSOUT=A //EXPDD DD DSN=xxx.x.x,DISP=(NEW,CATLG), // BLKSIZE=4096,SPACE=(CYL,(10,10)) //SYSIN DD * EXPORT SYS1.ICFCAT.UCATPLN - OUTFILE(EXPDD) - TEMPORARY /* //IMPORCT0 JOB (SDB-SYSP),CLASS=A,MSGCLASS=X,MSGLEVEL=(1,1), // NOTIFY=SYSUID //* // //* EXAMPLE OF HOW TO IMPORT A USER CATALOG* // //* //IMPORTEXEC PGM=IDCAMS //DD1 DD VOL=SER=xx,UNIT=3390,DISP=OLD //SYSPRINT DD SYSOUT=* //SYSIN DD * DELETE - CAT.USER.IMS - FILE(DD1) - RECOVERY - USERCATALOG IMPORT - INDATASET(xx.xx.xx) - OUTDATASET(SYS1.ICFCAT.UCATPLN) - OBJECTS((SYS1.ICFCAT.UCATPLN - VOLUMES(xx))) - INTOEMPTY - ALIAS- CATALOG(xxx.MASTER.xx) //* -Original Message- From: IBM Mainframe Discussion List [mailto:ibm-m...@bama.ua.edu] On Behalf Of esmie moo Sent: Thursday, July 16, 2009 1:25 AM To: IBM-MAIN@bama.ua.edu Subject: DEFINING USERCAT WITH GUARANTEED SPACE Good Day Gentle Readers, I need to move an existing USERCAT from one vol to another. The catalog is SMS managed and the STORAGECLASS I will be using is GUASPACE. Below is the cluster definition. I am not sure if I am missing anything. Could someone take a quick look and let me know if it is okay? //DEFINE EXEC PGM=IDCAMS,COND=(4,LT) //SYSPRINT DD SYSOUT=* //SYSIN DD * DEFINE - USERCATALOG - (NAME (SYS1.ICFCAT.UCATPLN) - CYL(25) - VOLUME(PLAN906) - STORAGECLASS(GUASPACE) - ICFCATALOG - STRNO(3) - FREESPACE(20 20) - NOIMBED - LOCK - SHAREOPTIONS(3 4)) - DATA( - CONTROLINTERVALSIZE(4096)) Thanks in advance. __ Connect with friends from any web browser - no download required. Try the new Yahoo! Canada Messenger for the Web BETA at http://ca.messenger.yahoo.com/webmessengerpromo.php -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html -- This message has been scanned by TM antivirus for viruses and spyware and found to be clean. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Minimum Available Central Storage Frames (Average %) Question
Dear Lister, Environment: OS390/2.10 9672/R16 (G5 machine) From the RMF report show decreasing Minimum Available Central Storage Frames. Table below show the decreasing: DateMinimum Central 3/3/200847.95 3/4/200853.44 CICSrestart : 9/18/2008 23.1 9/19/2008 20.85 9/20/2008 19.23 9/21/2008 16.82 9/22/2008 14.83 9/23/2008 13.14 9/24/2008 53.43 System IPL : 10/8/2008 50.46 10/9/2008 50.41 10/10/2008 50.11 10/11/2008 49.82 10/12/2008 49.87 10/13/2008 49.57 10/14/2008 49.07 10/15/2008 46.71 After we shutdown CICS or IPL system this frame will increase back. Question: 1. What happen if the out frame? 2. Any tool, setup, Rexx or Fixes can to reclaim the unused frame? 3. If we need to IPL OS/390 or shutdown CICS system regularly? (i.e Once a month) Any other suggestion is much appreciated Thanks in advance for all reply. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Re: Help with deleting datasets which are not cataloged or don't exist.
Dear Howard, How about try to delete using VVR option. May be can help. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
TSO PING command
Dear all, Try this command PING XXX.XXX.XXX.XXX TCP TCPIP follow from the manual get this error: EZZ3109I Extraneous parameter TCP. We in z/OS 1.4. Below is command from the manual. ──PING──┬─ host_name──┬───┬─┬─ │ └─(─┤ Option ├──┘ │ ├─ Help─┤ └─ ?┘ Option: ┐ ├───┬──┬┴─ ───┤ ├─Addrtype─┬─ipv4─┬┤ │ └─ipv6─┘│ │ ┌─1┐ │ ├─Count─┼──┼───┤ │ └─echo─┘ │ ├─Intf interface───┤ │┌─256───┐ │ ├─Length─┼───┼─┤ │└─bytes─┘ │ ├─Srcip srcip──┤ ├─TCP tcpname──┤ │ ┌─10──┐ │ └─Timeout─┼─┼──┘ └─seconds─┘ Thanks in advance. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
Delete noscratch
Dear Lister, I try to delete noscratch a dataset and found this error: Environment z/OS 1.7. VSAM CATALOG RETURN CODE IS 90 - REASON CODE IS IGG0CLFO-54 Looking at the message manual reason code up to 52. What is reason code 54? Thanks an advance who response. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
ADR427E - ERROR IN VVDS ON VOLUME
Dear Valueable Lister, I encounter a problem during ADRDSSU dump. We in sysplex environment. OS z/OS 1.6. Please anybody ever encounter the same problem may be can share the experince how to do about it. Please find the full error message. 0ADR427E (001)-GSFER(01), ERROR IN VVDS ON VOLUME xxxnnn WHILE ACCESSING COMPONENTS OF CLUSTER .xx.xx.xnn.xx.Vnn IN CATALOG Thank you very much. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
File transfer(NDM) and DFHSM Recall
Dear Lister, I have situation where is recall in progress(NDM fire transfer request) and recall in Queue. At the same time my automigration backup is started. Question: 1. What happen to my recall? 2. What happen to my CDS backup? 3. What happen to NDM file transfer? Display GRS show: S=SYSTEM ARCENQG ARCCDSVF SYSNAME JOBNAME ASIDTCBADDREXC/SHR STATUS SP02DFHSM 009E5930 EXCLUSIVE OWN SP01DFHSM 009A0268 EXCLUSIVE WAIT S=SYSTEM ARCGPA ARCCAT SP02DFHSM 0099CE88 SHARE OWN SP02DFSM 009E5930 EXCLUSIVE WAIT S=SYSTEM SYSZTIOT G SP02NDM 00988918 EXCLUSIVEOWN SP02NDM 009B2078 SHARE WAIT SP02NDM 009E0750 SHARE WAIT SP02NDM 009B38C8 SHARE WAIT Thanks and Regards, -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
HSM Recycle help
Dear Listers, I try to recycle 1 tape with connected sets more than 40 tapes. If anybody can help me to solve it. Below is the message: RECYCLE VOLUME(832303) EXECUTE ARC0830I RECYCLE COMMAND PROCESSING STARTING ARC0838I VOLUME 832303 FULL=YES, PERCENT VALID=100, VOLUME TYPE=DAILY(06), FAILED RECYCLE=NO, DISASTER ALTERNATE=NO, FAILED CREATION=NO ARC0838I VOLUME 590353 FULL=YES, PERCENT VALID=100, VOLUME TYPE=DAILY(06), FAILED RECYCLE=NO, DISASTER ALTERNATE=NO, FAILED CREATION=NO ARC0838I VOLUME 590351 FULL=YES, PERCENT VALID=100, VOLUME TYPE=DAILY(06), FAILED RECYCLE=NO, DISASTER ALTERNATE=NO, FAILED CREATION=NO ARC0838I VOLUME 590348 FULL=YES, PERCENT VALID=100, VOLUME TYPE=DAILY(06), FAILED RECYCLE=NO, DISASTER ALTERNATE=NO, FAILED CREATION=NO ; ; ; ARC0445I VOLUME 832303 CANNOT BE RECYCLED, REASON= 0028, EXPLANATION: CONNECTED SET TOO LONG ARC0847I RECYCLE INPUT VOLUMES FREED=, OUTPUT VOLUMES USED= ARC0831I RECYCLE COMMAND PROCESSING ENDING Explanation: During the processing of a recycle request for a specific volume, the information requested is displayed. If a volume belongs to a connected set, there will be an ARC0838I message for each volume in the set. 28CONNECTED SET TOO LONG: DFSMShsm will not recycle connected sets exceeding 40 volumes. The volume specified belongs to a connected set exceeding this limit. -- Regards, Mohd Shahrifuddin Bin Ahmad Masri Sunflower Consulting and Services Co Ltd Room 401 Minjin Xiaoyun Bldg., Block 7 Xiaoyunli, xiaoyun Road, Chaoyang District,Beijing 100016,China Mobile: (86) 1391-176-9704 Fax: (8610) 6466-1840 -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
HSM recall overwrite other dataset
Hi Listers, Two Question: 1. Environment z/OS v1.4 SMS v1.3. Running Parallel Sysplex Shared DASD between 2 sysplex 2 SMS SCDS 1 catalog We implement HSM in 1 sysplex. First phase we cutover 2 storage groups migration, backup and dump. When the dataset is migrate another sysplex show migrated. We recall from the HSM sysplex but some how in another sysplex is overwrite other dataset. Is possible or not? Please advice or if there any fix or patch? 2. In Manual z/OS v1.3 DFDSSdfp Storage Administration reference SC26-7402- 01 1.5 Running SMS in a Parallel Sysplex Environment An SMS complex consists of systems or system groups that share a common configuration. A Parallel Sysplex is made up of systems that share a cross-system coupling facility (XCF); you can run multiple SMS complexes within a Parallel Sysplex. Restrictions: An SMS complex should not span sysplexes. All of the volumes in the SMS complex should be in the same Parallel Sysplex. The cross-system sharing functions, such as VSAM record-level sharing (RLS), partitioned data set extended (PDSE) sharing, RACF(TM) security and global shared resources (GRS) serialization, only work within the scope of a single Parallel Sysplex. These functions are not supported when the SMS complex extends beyond the Parallel Sysplex in which they are carried out. Do not set up multiple SMS complexes sharing the same DASD. This requires extra work to maintain the duplicate SMS configurations and can also create problems such as running out of disk space because one configuration cannot know about changes made to the other configuration, such as data set allocations and deletions, and storage group and volume status changes. Mean we cannot shared dasd with two SMS SCDS in 2 sysplex? Please advice about my understanding. If happen like this what should I do? If need to fall back to non-sms managed in shared DASD between 2 sysplex. -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html
HSM recall overwrite other dataset in different sysplex
Hi Listers, Two Question: 1. Environment z/OS v1.4 SMS v1.3. Running Parallel Sysplex Shared DASD between 2 sysplex 2 SMS SCDS 1 catalog We implement HSM in 1 sysplex. First phase we cutover 2 storage groups migration, backup and dump. When the dataset is migrate another sysplex show migrated. We recall from the HSM sysplex but some how in another sysplex is overwrite other dataset. Is possible or not? Please advice or if there any fix or patch? 2. In Manual z/OS v1.3 DFDSSdfp Storage Administration reference SC26-7402- 01 1.5 Running SMS in a Parallel Sysplex Environment An SMS complex consists of systems or system groups that share a common configuration. A Parallel Sysplex is made up of systems that share a cross-system coupling facility (XCF); you can run multiple SMS complexes within a Parallel Sysplex. Restrictions: An SMS complex should not span sysplexes. All of the volumes in the SMS complex should be in the same Parallel Sysplex. The cross-system sharing functions, such as VSAM record-level sharing (RLS), partitioned data set extended (PDSE) sharing, RACF(TM) security and global shared resources (GRS) serialization, only work within the scope of a single Parallel Sysplex. These functions are not supported when the SMS complex extends beyond the Parallel Sysplex in which they are carried out. Do not set up multiple SMS complexes sharing the same DASD. This requires extra work to maintain the duplicate SMS configurations and can also create problems such as running out of disk space because one configuration cannot know about changes made to the other configuration, such as data set allocations and deletions, and storage group and volume status changes. Mean we cannot shared dasd with two SMS SCDS in 2 sysplex? Please advice about my understanding. If happen like this what should I do? If need to fall back to non-sms managed in shared DASD between 2 sysplex. -- Regards, Mohd Shahrifuddin Bin Ahmad Masri Sunflower Consulting and Services Co Ltd Room 401 Minjin Xiaoyun Bldg., Block 7 Xiaoyunli, xiaoyun Road, Chaoyang District,Beijing 100016,China Mobile: (86) 1391-176-9704 Fax: (8610) 6466-1840 -- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html