[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-19 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16172131#comment-16172131
 ] 

Hudson commented on AMBARI-21971:
-

FAILURE: Integrated in Jenkins build Ambari-trunk-Commit #8095 (See 
[https://builds.apache.org/job/Ambari-trunk-Commit/8095/])
Revert "AMBARI-21971. Fix compilation with java7" (Nishant: 
[http://git-wip-us.apache.org/repos/asf?p=ambari.git=commit=baa16567244e7246f5cc7cd964b1fba81bc21447])
* (edit) 
ambari-server/src/test/java/org/apache/ambari/server/checks/DruidHighAvailabilityCheckTest.java
* (edit) 
ambari-server/src/main/java/org/apache/ambari/server/checks/DruidHighAvailabilityCheck.java


> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.2.patch, 
> AMBARI-21971-ADDENDUM.patch, AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-19 Thread Nishant Bangarwa (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16172058#comment-16172058
 ] 

Nishant Bangarwa commented on AMBARI-21971:
---

thanks for the update. 
Have reverted this in trunk. only committed in branch-2.6

> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.2.patch, 
> AMBARI-21971-ADDENDUM.patch, AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-19 Thread JIRA

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16172041#comment-16172041
 ] 

Olivér Szabó commented on AMBARI-21971:
---

hi, [~nishantbangarwa]

I do not think the java7 fix part is required for trunk (only for branch-2.6):
take a look:
https://cwiki.apache.org/confluence/display/AMBARI/Ambari+Development

from 3.0, java 8 is required (but i guess the issue happened because the 
feature was developed on trunk)


> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.2.patch, 
> AMBARI-21971-ADDENDUM.patch, AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-19 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16172027#comment-16172027
 ] 

Hudson commented on AMBARI-21971:
-

FAILURE: Integrated in Jenkins build Ambari-trunk-Commit #8093 (See 
[https://builds.apache.org/job/Ambari-trunk-Commit/8093/])
AMBARI-21971. Fix compilation with java7 (Nishant: 
[http://git-wip-us.apache.org/repos/asf?p=ambari.git=commit=f7c9e1ee5799632ce8ce2d68a56dbdb2aabf29d4])
* (edit) 
ambari-server/src/main/java/org/apache/ambari/server/checks/DruidHighAvailabilityCheck.java
* (edit) 
ambari-server/src/test/java/org/apache/ambari/server/checks/DruidHighAvailabilityCheckTest.java


> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.2.patch, 
> AMBARI-21971-ADDENDUM.patch, AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-18 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16170510#comment-16170510
 ] 

Hadoop QA commented on AMBARI-21971:


{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12887701/AMBARI-21971.2.patch
  against trunk revision .

{color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

{color:green}+1 tests included{color}.  The patch appears to include 1 new 
or modified test files.

{color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

{color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

{color:red}-1 core tests{color}.  The test build failed in 
[ambari-server|https://builds.apache.org/job/Ambari-trunk-test-patch/12266//artifact/patch-work/testrun_ambari-server.txt]
 

Console output: 
https://builds.apache.org/job/Ambari-trunk-test-patch/12266//console

This message is automatically generated.

> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.2.patch, 
> AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-18 Thread Swapan Shridhar (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16170500#comment-16170500
 ] 

Swapan Shridhar commented on AMBARI-21971:
--

commit

trunk

{code}
commit 4c858d018765ac78fff9d395271ad470a96936da
Author: Nishant 
Date:   Sat Sep 16 03:27:37 2017 +0530

Add Druid High Availability Check for Rolling Upgrades. (Nishant Bangarwa 
via Swapan Shridhar).
{code}

branch-2.6

{code}
commit abbb759a3ada4491eb5a13a6eee4e15021cfc556
Author: Nishant 
Date:   Sat Sep 16 03:27:37 2017 +0530

Add Druid High Availability Check for Rolling Upgrades. (Nishant Bangarwa 
via Swapan Shridhar).
{code}

CC [~nishantbangarwa]

> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.2.patch, 
> AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-18 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16169702#comment-16169702
 ] 

Hadoop QA commented on AMBARI-21971:


{color:green}+1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12887601/AMBARI-21971.1.patch
  against trunk revision .

{color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

{color:green}+1 tests included{color}.  The patch appears to include 1 new 
or modified test files.

{color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

{color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

{color:green}+1 core tests{color}.  The patch passed unit tests in 
ambari-server.

Console output: 
https://builds.apache.org/job/Ambari-trunk-test-patch/12246//console

This message is automatically generated.

> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.1.patch, AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Commented] (AMBARI-21971) Add Druid High Availability Check for Rolling Upgrades

2017-09-15 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/AMBARI-21971?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16168634#comment-16168634
 ] 

Hadoop QA commented on AMBARI-21971:


{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12887439/AMBARI-21971.patch
  against trunk revision .

{color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

{color:green}+1 tests included{color}.  The patch appears to include 1 new 
or modified test files.

{color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

{color:red}-1 javac{color}.  The patch appears to cause the [build to 
fail|https://builds.apache.org/job/Ambari-trunk-test-patch/12245//artifact/patch-work/patchJavacWarnings.txt].

Console output: 
https://builds.apache.org/job/Ambari-trunk-test-patch/12245//console

This message is automatically generated.

> Add Druid High Availability Check for Rolling Upgrades
> --
>
> Key: AMBARI-21971
> URL: https://issues.apache.org/jira/browse/AMBARI-21971
> Project: Ambari
>  Issue Type: Task
>Reporter: Nishant Bangarwa
>Assignee: Nishant Bangarwa
> Fix For: trunk, 2.6.0
>
> Attachments: AMBARI-21971.patch
>
>
> For Druid Rolling Upgrades check that each druid component is installed on 
> more than 1 node and is HA enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)