[jira] [Closed] (FLINK-9120) Task Manager Fault Tolerance issue

2018-04-05 Thread Till Rohrmann (JIRA)

 [ 
https://issues.apache.org/jira/browse/FLINK-9120?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Till Rohrmann closed FLINK-9120.

Resolution: Invalid

> Task Manager Fault Tolerance issue
> --
>
> Key: FLINK-9120
> URL: https://issues.apache.org/jira/browse/FLINK-9120
> Project: Flink
>  Issue Type: Bug
>  Components: Cluster Management, Configuration, Core
>Affects Versions: 1.4.2
>Reporter: dhiraj prajapati
>Priority: Critical
> Attachments: flink-dhiraj.prajapati-client-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-client-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-jobmanager-5-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-jobmanager-5-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-taskmanager-5-ip-10-14-25-116.log, 
> flink-dhiraj.prajapati-taskmanager-5-ip-10-14-25-116.log
>
>
> HI, 
> I have set up a flink 1.4 cluster with 1 job manager and two task managers. 
> The configs taskmanager.numberOfTaskSlots and parallelism.default were set 
> to 2 on each node. I submitted a job to this cluster and it runs fine. To 
> test fault tolerance, I killed one task manager. I was expecting the job to 
> run fine because one of the 2 task managers was still up and running. 
> However, the job failed. Am I missing something? 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)


[jira] [Closed] (FLINK-9120) Task Manager Fault Tolerance issue

2018-04-04 Thread dhiraj prajapati (JIRA)

 [ 
https://issues.apache.org/jira/browse/FLINK-9120?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

dhiraj prajapati closed FLINK-9120.
---
Resolution: Invalid

> Task Manager Fault Tolerance issue
> --
>
> Key: FLINK-9120
> URL: https://issues.apache.org/jira/browse/FLINK-9120
> Project: Flink
>  Issue Type: Bug
>  Components: Cluster Management, Configuration, Core
>Affects Versions: 1.4.2
>Reporter: dhiraj prajapati
>Priority: Critical
> Attachments: flink-dhiraj.prajapati-client-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-client-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-jobmanager-5-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-jobmanager-5-ip-10-14-25-115.log, 
> flink-dhiraj.prajapati-taskmanager-5-ip-10-14-25-116.log, 
> flink-dhiraj.prajapati-taskmanager-5-ip-10-14-25-116.log
>
>
> HI, 
> I have set up a flink 1.4 cluster with 1 job manager and two task managers. 
> The configs taskmanager.numberOfTaskSlots and parallelism.default were set 
> to 2 on each node. I submitted a job to this cluster and it runs fine. To 
> test fault tolerance, I killed one task manager. I was expecting the job to 
> run fine because one of the 2 task managers was still up and running. 
> However, the job failed. Am I missing something? 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)