[jira] [Commented] (HBASE-13182) Test NamespaceAuditor/AccessController create/delete table is flaky
[ https://issues.apache.org/jira/browse/HBASE-13182?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14354777#comment-14354777 ] Hudson commented on HBASE-13182: SUCCESS: Integrated in HBase-TRUNK #6233 (See [https://builds.apache.org/job/HBase-TRUNK/6233/]) HBASE-13182 Test NamespaceAuditor/AccessController create/delete table is flaky (matteo.bertozzi: rev eeb8c846d99970f590c695d00732f8c4f02defda) * hbase-server/src/test/java/org/apache/hadoop/hbase/security/access/TestAccessController.java * hbase-server/src/test/java/org/apache/hadoop/hbase/security/access/TestAccessController2.java * hbase-server/src/test/java/org/apache/hadoop/hbase/security/access/SecureTestUtil.java * hbase-server/src/test/java/org/apache/hadoop/hbase/namespace/TestNamespaceAuditor.java Test NamespaceAuditor/AccessController create/delete table is flaky --- Key: HBASE-13182 URL: https://issues.apache.org/jira/browse/HBASE-13182 Project: HBase Issue Type: Test Components: test Reporter: Matteo Bertozzi Assignee: Matteo Bertozzi Priority: Minor Fix For: 2.0.0, 1.1.0 Attachments: HBASE-13182-v0.patch Similar to HBASE-13179 TestNamespaceAuditor and the two test AccessController fail when create or delete table takes more time.and it is because the sync version of the Admin operation is not sync, but relies on the last operation on the server e.g. delete meta. but the post-operation method of the coprocessor is called after meta is deleted.. long story short, the client is not really sync and it will be fixed by HBASE-12439. similar to what we do in TestMasterObserver we can add an observer with a countDownLatch to wait the postOpHandler call. -- This message was sent by Atlassian JIRA (v6.3.4#6332)
[jira] [Commented] (HBASE-13182) Test NamespaceAuditor/AccessController create/delete table is flaky
[ https://issues.apache.org/jira/browse/HBASE-13182?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14354594#comment-14354594 ] Hudson commented on HBASE-13182: FAILURE: Integrated in HBase-1.1 #269 (See [https://builds.apache.org/job/HBase-1.1/269/]) HBASE-13182 TestAccessController create/delete table is flaky (matteo.bertozzi: rev 52ff5485a8d0997f58514d4ef807faccc7378e5a) * hbase-server/src/test/java/org/apache/hadoop/hbase/security/access/SecureTestUtil.java * hbase-server/src/test/java/org/apache/hadoop/hbase/security/access/TestAccessController2.java * hbase-server/src/test/java/org/apache/hadoop/hbase/security/access/TestAccessController.java Test NamespaceAuditor/AccessController create/delete table is flaky --- Key: HBASE-13182 URL: https://issues.apache.org/jira/browse/HBASE-13182 Project: HBase Issue Type: Test Components: test Reporter: Matteo Bertozzi Assignee: Matteo Bertozzi Priority: Minor Fix For: 2.0.0, 1.1.0 Attachments: HBASE-13182-v0.patch Similar to HBASE-13179 TestNamespaceAuditor and the two test AccessController fail when create or delete table takes more time.and it is because the sync version of the Admin operation is not sync, but relies on the last operation on the server e.g. delete meta. but the post-operation method of the coprocessor is called after meta is deleted.. long story short, the client is not really sync and it will be fixed by HBASE-12439. similar to what we do in TestMasterObserver we can add an observer with a countDownLatch to wait the postOpHandler call. -- This message was sent by Atlassian JIRA (v6.3.4#6332)
[jira] [Commented] (HBASE-13182) Test NamespaceAuditor/AccessController create/delete table is flaky
[ https://issues.apache.org/jira/browse/HBASE-13182?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14353811#comment-14353811 ] Enis Soztutar commented on HBASE-13182: --- +1. Test NamespaceAuditor/AccessController create/delete table is flaky --- Key: HBASE-13182 URL: https://issues.apache.org/jira/browse/HBASE-13182 Project: HBase Issue Type: Test Components: test Reporter: Matteo Bertozzi Assignee: Matteo Bertozzi Priority: Minor Attachments: HBASE-13182-v0.patch Similar to HBASE-13179 TestNamespaceAuditor and the two test AccessController fail when create or delete table takes more time.and it is because the sync version of the Admin operation is not sync, but relies on the last operation on the server e.g. delete meta. but the post-operation method of the coprocessor is called after meta is deleted.. long story short, the client is not really sync and it will be fixed by HBASE-12439. similar to what we do in TestMasterObserver we can add an observer with a countDownLatch to wait the postOpHandler call. -- This message was sent by Atlassian JIRA (v6.3.4#6332)
[jira] [Commented] (HBASE-13182) Test NamespaceAuditor/AccessController create/delete table is flaky
[ https://issues.apache.org/jira/browse/HBASE-13182?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14353802#comment-14353802 ] Srikanth Srungarapu commented on HBASE-13182: - +1(non-binding). Test NamespaceAuditor/AccessController create/delete table is flaky --- Key: HBASE-13182 URL: https://issues.apache.org/jira/browse/HBASE-13182 Project: HBase Issue Type: Test Components: test Reporter: Matteo Bertozzi Assignee: Matteo Bertozzi Priority: Minor Attachments: HBASE-13182-v0.patch Similar to HBASE-13179 TestNamespaceAuditor and the two test AccessController fail when create or delete table takes more time.and it is because the sync version of the Admin operation is not sync, but relies on the last operation on the server e.g. delete meta. but the post-operation method of the coprocessor is called after meta is deleted.. long story short, the client is not really sync and it will be fixed by HBASE-12439. similar to what we do in TestMasterObserver we can add an observer with a countDownLatch to wait the postOpHandler call. -- This message was sent by Atlassian JIRA (v6.3.4#6332)
[jira] [Commented] (HBASE-13182) Test NamespaceAuditor/AccessController create/delete table is flaky
[ https://issues.apache.org/jira/browse/HBASE-13182?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14353977#comment-14353977 ] Hadoop QA commented on HBASE-13182: --- {color:red}-1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12703510/HBASE-13182-v0.patch against master branch at commit 61cc8e0de12987b1d64fd06fa27a55c89c4a742f. ATTACHMENT ID: 12703510 {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 12 new or modified tests. {color:green}+1 hadoop versions{color}. The patch compiles with all supported hadoop versions (2.4.1 2.5.2 2.6.0) {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javadoc{color}. The javadoc tool did not generate any warning messages. {color:green}+1 checkstyle{color}. The applied patch does not increase the total number of checkstyle errors {color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 2.0.3) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:green}+1 lineLengths{color}. The patch does not introduce lines longer than 100 {color:red}-1 site{color}. The patch appears to cause mvn site goal to fail. {color:green}+1 core tests{color}. The patch passed unit tests in . Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//testReport/ Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-hadoop-compat.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-prefix-tree.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-examples.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-server.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-common.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-rest.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-protocol.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-client.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-thrift.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-hadoop2-compat.html Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/newPatchFindbugsWarningshbase-annotations.html Checkstyle Errors: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//artifact/patchprocess/checkstyle-aggregate.html Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/13145//console This message is automatically generated. Test NamespaceAuditor/AccessController create/delete table is flaky --- Key: HBASE-13182 URL: https://issues.apache.org/jira/browse/HBASE-13182 Project: HBase Issue Type: Test Components: test Reporter: Matteo Bertozzi Assignee: Matteo Bertozzi Priority: Minor Attachments: HBASE-13182-v0.patch Similar to HBASE-13179 TestNamespaceAuditor and the two test AccessController fail when create or delete table takes more time.and it is because the sync version of the Admin operation is not sync, but relies on the last operation on the server e.g. delete meta. but the post-operation method of the coprocessor is called after meta is deleted.. long story short, the client is not really sync and it will be fixed by HBASE-12439. similar to what we do in TestMasterObserver we can add an observer with a countDownLatch to wait the postOpHandler call. -- This message was sent by Atlassian JIRA (v6.3.4#6332)