[ https://issues.apache.org/jira/browse/STORM-3755?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Ethan Li resolved STORM-3755. ----------------------------- Resolution: Fixed Thanks [~bipinprasad]. I merges this to master: 4de0622c6e25e891419f8ccd002e243470dfe969 > While scheduling multiple ackers with executor use best effort basis > -------------------------------------------------------------------- > > Key: STORM-3755 > URL: https://issues.apache.org/jira/browse/STORM-3755 > Project: Apache Storm > Issue Type: Improvement > Components: storm-server > Reporter: Bipin Prasad > Assignee: Bipin Prasad > Priority: Minor > Fix For: 2.3.0 > > Time Spent: 20m > Remaining Estimate: 0h > > In the scheduling loop, if the number of ackers to be scheduled along with > the executor is greater than zero, and they cannot all fit, then try to fit > as many ackers as possible. > To do this, fit the executor first. If this succeeds, then attempt to fit as > many ackers are possible upto and including the max required as per > calculation (and as low as zero). This second step should not fail. -- This message was sent by Atlassian Jira (v8.3.4#803005)