[JIRA] (JENKINS-36870) Build hangs in several phases (post build, pre build, email-ext)

2016-07-29 Thread thomas.wab...@siemens.com (JIRA)
Title: Message Title


 
 
 
 

 
 
 

 
   
 Thomas Wabner closed an issue as Not A Defect  
 

  
 
 
 
 

 
 
  
 
 
 
 

 
 Thanks for your help. We have tried to check with debug enabled and started to disable some plugins. Therefore we found one suspecting plugin which uses ldap callbacks to get email adresses for users from AD backend. And this plugin makes a deadlock. After disabled security at all, all build running fine. After patching the ldap plugin we have a working jenkins instance back. Thank you again.  
 

  
 
 
 
 

 
 Jenkins /  JENKINS-36870  
 
 
  Build hangs in several phases (post build, pre build, email-ext)   
 

  
 
 
 
 

 
Change By: 
 Thomas Wabner  
 
 
Status: 
 Open Closed  
 
 
Resolution: 
 Not A Defect  
 

  
 
 
 
 

 
 
 

 
 
 Add Comment  
 

  
 

  
 
 
 
  
 

  
 
 
 
 

 
 This message was sent by Atlassian JIRA (v7.1.7#71011-sha1:2526d7c)  
 
 

 
   
 

  
 
  

[JIRA] (JENKINS-36870) Build hangs in several phases (post build, pre build, email-ext)

2016-07-23 Thread da...@vanlaatum.id.au (JIRA)
Title: Message Title


 
 
 
 

 
 
 

 
   
 David van Laatum commented on  JENKINS-36870  
 

  
 
 
 
 

 
 
  
 
 
 
 

 
  Re: Build hangs in several phases (post build, pre build, email-ext)   
 

  
 
 
 
 

 
 Have you tried removing the email-ext plugin and confirmed it does or does not happen without it? "Enable Debug Mode" in global configuration may also provide more info or adjusting log levels at /log/levels.  
 

  
 
 
 
 

 
 
 

 
 
 Add Comment  
 

  
 

  
 
 
 
  
 

  
 
 
 
 

 
 This message was sent by Atlassian JIRA (v7.1.7#71011-sha1:2526d7c)  
 
 

 
   
 

  
 

  
 

   





-- 
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] (JENKINS-36870) Build hangs in several phases (post build, pre build, email-ext)

2016-07-22 Thread thomas.wab...@siemens.com (JIRA)
Title: Message Title


 
 
 
 

 
 
 

 
   
 Thomas Wabner updated an issue  
 

  
 
 
 
 

 
 
  
 
 
 
 

 
 Jenkins /  JENKINS-36870  
 
 
  Build hangs in several phases (post build, pre build, email-ext)   
 

  
 
 
 
 

 
Change By: 
 Thomas Wabner  
 

  
 
 
 
 

 
 After upgrading Jenkins LTS version from 1.651. 2 1  to 2.7.1 we have nearly all builds hanging. Some of them hanging in "Before Build" phase and some are seem to be finished but hanging also.For example the output for a hanging build in "before build" phase:{quote}[EnvInject] - Variables injected successfully.Email was triggered for: Before BuildSending email for trigger: Before Build{quote}And an example about the "finished build" phase:{quote}[INFO] BUILD SUCCESS[INFO] [INFO] Total time: 01:33 min[INFO] Finished at: 2016-07-22T10:34:15+02:00[INFO] Final Memory: 71M/809M[INFO] Waiting for Jenkins to finish collecting datachannel stoppedJava HotSpot(TM) 64-Bit Server VM warning: ignoring option PermSize=128m; support was removed in 8.0Java HotSpot(TM) 64-Bit Server VM warning: ignoring option MaxPermSize=256m; support was removed in 8.0{quote}We guess it is a general problem with jenkins master/node .. nothing plugin specific. But for example builds with simple scripts (powershell) working and sending emails (so not email-ext specific) and some builds are finishing after a great period of time.We have no clue which circumstances making this behavior.We have also seen this after trying to upgrade LTS from 1.651.2 to 1.651.3 .. so possible some changes between those versions making the difference.  
 

  
 
 
 
 

 
 
 

 
 
 Add Comment  
 

  
 

  
 
 
 
  
 

  
 
 
 
 
 

[JIRA] (JENKINS-36870) Build hangs in several phases (post build, pre build, email-ext)

2016-07-22 Thread thomas.wab...@siemens.com (JIRA)
Title: Message Title


 
 
 
 

 
 
 

 
   
 Thomas Wabner updated an issue  
 

  
 
 
 
 

 
 
  
 
 
 
 

 
 Jenkins /  JENKINS-36870  
 
 
  Build hangs in several phases (post build, pre build, email-ext)   
 

  
 
 
 
 

 
Change By: 
 Thomas Wabner  
 

  
 
 
 
 

 
 After upgrading Jenkins LTS version from 1.651.1 to 2.7.1 we have nearly all builds hanging. Some of them hanging in "Before Build" phase and some are seem to be finished but hanging also.For example the output for a hanging build in "before build" phase:{quote}[EnvInject] - Variables injected successfully.Email was triggered for: Before BuildSending email for trigger: Before Build{quote}And an example about the "finished build" phase:{quote}[INFO] BUILD SUCCESS[INFO] [INFO] Total time: 01:33 min[INFO] Finished at: 2016-07-22T10:34:15+02:00[INFO] Final Memory: 71M/809M[INFO] Waiting for Jenkins to finish collecting datachannel stoppedJava HotSpot(TM) 64-Bit Server VM warning: ignoring option PermSize=128m; support was removed in 8.0Java HotSpot(TM) 64-Bit Server VM warning: ignoring option MaxPermSize=256m; support was removed in 8.0{quote}We guess it is a general problem with jenkins master/node .. nothing plugin specific. But for example builds with simple scripts (powershell) working and sending emails (so not email-ext specific) and some builds are finishing after a great period of time.We have no clue which circumstances making this behavior.We have also seen this after trying to upgrade LTS from 1.651. 2 1  to 1.651. 3 2  .. so possible some changes between those versions making the difference.  
 

  
 
 
 
 

 
 
 

 
 
 Add Comment  
 

  
 

  
 
 
 
  
 

  
 
 
 
   

[JIRA] (JENKINS-36870) Build hangs in several phases (post build, pre build, email-ext)

2016-07-22 Thread thomas.wab...@siemens.com (JIRA)
Title: Message Title


 
 
 
 

 
 
 

 
   
 Thomas Wabner created an issue  
 

  
 
 
 
 

 
 
  
 
 
 
 

 
 Jenkins /  JENKINS-36870  
 
 
  Build hangs in several phases (post build, pre build, email-ext)   
 

  
 
 
 
 

 
Issue Type: 
  Bug  
 
 
Assignee: 
 David van Laatum  
 
 
Attachments: 
 delpzs9900dsrv-thread-dump.txt, Thread dump [Jenkins].html  
 
 
Components: 
 email-ext-plugin, maven-plugin  
 
 
Created: 
 2016/Jul/22 9:36 AM  
 
 
Environment: 
 Windows 2012 slave and master installation  
 
 
Labels: 
 jenkins master node  
 
 
Priority: 
  Blocker  
 
 
Reporter: 
 Thomas Wabner  
 

  
 
 
 
 

 
 After upgrading Jenkins LTS version from 1.651.2 to 2.7.1 we have nearly all builds hanging. Some of them hanging in "Before Build" phase and some are seem to be finished but hanging also. For example the output for a hanging build in "before build" phase: 
 
[EnvInject] - Variables injected successfully. Email was triggered for: Before Build Sending email for trigger: Before Build
 And an example about the "finished build" phase: 
 
[INFO] BUILD SUCCESS [INFO]  [INFO] Total time: 01:33 min [INFO] Finished at: 2016-07-22T10:34:15+02:00 [INFO] Final Memory: 71M/