Hi Marco,
I think this does not hold if the Scheduler type is Realtime, right? I
should have mentioned that earlier :(
Prateek
On 7/4/06, Marco Fiore [EMAIL PROTECTED] wrote:
Prateek,
setting the finish time to a high value should not cause any
harm, nor should it make you wait more.
Since ns-2 is an event-driven
simulator, once no event is scheduled the time shall move directly to
the
'end of simulation' event, in no (user) time.
I don't know if
other better solutions exist, though.
Marco
Messaggio
originale
Da: [EMAIL PROTECTED]
Data: 4-lug-2006 12.53 PM
A: ns-users@ISI.EDU
Ogg: [ns] Ending the simulation after a
transfer is finished
Hi,
Is there a way to end the simulation
just after a transfer is finished and
not by specifying a time on
which to end it. For e.g.: my script has a line:
$ns at 5.0 $ftp
send 6000
Where ns is a network simulator object and ftp is an ftp
application object.
Now, I don't know at what time will this transfer
be over. So, I can't have
a line which says:
$ns at 10.0 finish
I also don't want to use a big number for the time over there because
that
will mean unnecessary waiting in most cases.
Is there a way to
end the simulation when $ftp is over with its transfer? In
other
words, is there a way to know the time when a transfer will be over?
Thanks,
Prateek Singhal
--
Prateek Singhal | mailto:singhal.
[EMAIL PROTECTED]
--
Prateek Singhal | mailto:[EMAIL PROTECTED]