RE: Export/Import Job

2001-12-03 Thread Hallas John



Exporting an individual schema within APPS (GL /PA etc) 
is not recommended due to the number of constraints that cross schemas (to fnd 
tables for instance).
So 
changing the block size is essentially non Apps specific and is just a straight 
export /import.
Depending on your hardware and plan I would have 
expected you to be able to start on a Saturday and complete on Sunday 
(sometime).
Run as 
much archiving/purging as you can (certainly tables like fnd_requests should be 
tidied down as much as possible).
Have a 
few dummy runs so that the the scripts are all fully tested and you have a good 
checklist of all the scripts and expected timings.
Most 
importantly of all ensure that you can revert back from your backup safely and 
as quickly as possible.
Hopefully you will have the space to pre-create the 
instance (dummy sid) and then rename it once you have completed the export of 
live (Come to think of it, if you have that space you can retain both instances 
and that certainly helps if you decide to abandon the build or revert for any 
reason)


PS 
Unless the database really needs re-building what other benefits do you expect 
from changing the block size?

HTH

John



  -Original Message-From: Nick Wagner 
  [mailto:[EMAIL PROTECTED]]Sent: 30 November 2001 
  21:05To: Multiple recipients of list ORACLE-LSubject: 
  Export/Import Job
  If anyone out 
  there has a good time estimate for the following export/import job I would 
  appreciate it. The goal is to change the DB_BLOCK_SIZE. 
  
  
  Application: 
  Oracle Apps 11i
  Database Size: 
  100GB, actually only about 80GB is used space.
  2 CPU HP L-Class 
  machine. 
  
  I just need a 
  couple of good estimates of how many days/hours this will take. 
  I'm guessing around 3 days... but I have never done anything this large 
  before. 
  
  Thanks!! 
  
  
  Nick

>>
This electronic message contains information from the mmO2 plc Group 
which may be privileged or confidential. The information is intended to be 
for the use of the individual(s) or entity named above. If you are not the 
intended recipient be aware that any disclosure, copying, distribution or 
use of the contents of this information is prohibited. If you have received 
this electronic message in error, please notify us by telephone or email 
(to the numbers or address above) immediately.
>>




RE: Export/Import Job

2001-11-30 Thread John Kanagaraj

Nick,
 
Export/Import on an Oracle Apps database is not very well supported. It is
my understanding (from another list) that a bug (or is that a feature :)
currently exists. This may not be applicable in your situation. A loss of
Java objects has been reported. Keeping in mind that Quest may need to know
about this for a testing scenario, this may be Ok, but not if you want the
Apps database to work from a logical point of view Nick, if you would to
like to follow this up, join the OAUGnet-DBA list at 'www.oaug.net' via the
Web ans search for the thread 'RE: export/import of 11i database - fyi
update'.
 

John Kanagaraj
Oracle Applications DBA
DBSoft Inc
(W): 408-970-7002

Kill your killer-commute! Listen to great commercial-free christian music
24x7 (details at www.klove.com)

** The opinions and statements above are entirely my own and not
those of my employer or clients **


-Original Message-
Sent: Friday, November 30, 2001 1:05 PM
To: Multiple recipients of list ORACLE-L


If anyone out there has a good time estimate for the following export/import
job I would appreciate it.  The goal is to change the DB_BLOCK_SIZE.  
 
Application: Oracle Apps 11i
Database Size: 100GB, actually only about 80GB is used space.
2 CPU HP L-Class machine.  
 
I just need a couple of good estimates of how many days/hours this will
take.   I'm guessing around 3 days...  but I have never done anything this
large before. 
 
Thanks!! 
 
Nick

-- 
Please see the official ORACLE-L FAQ: http://www.orafaq.com
-- 
Author: John Kanagaraj
  INET: [EMAIL PROTECTED]

Fat City Network Services-- (858) 538-5051  FAX: (858) 538-5051
San Diego, California-- Public Internet access / Mailing Lists

To REMOVE yourself from this mailing list, send an E-Mail message
to: [EMAIL PROTECTED] (note EXACT spelling of 'ListGuru') and in
the message BODY, include a line containing: UNSUB ORACLE-L
(or the name of mailing list you want to be removed from).  You may
also send the HELP command for other information (like subscribing).