Jira (PDB-1183) Logs: Performance testing and proving of the solution before work commencement

2015-11-20 Thread Kurt Wall (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kurt Wall updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 PuppetDB /  PDB-1183 
 
 
 
  Logs: Performance testing and proving of the solution before work commencement  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kurt Wall 
 
 
 

QA Status:
 
 Reviewed 
 
 
 

QA Risk Assessment:
 
 Low 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.12#64027-sha1:e3691cc) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PDB-1183) Logs: Performance testing and proving of the solution before work commencement

2015-02-11 Thread Kenneth Barber (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kenneth Barber updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 PuppetDB /  PDB-1183 
 
 
 
  Logs: Performance testing and proving of the solution before work commencement  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kenneth Barber 
 
 
 

Story Points:
 
 5 3 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.10#6340-sha1:7ea293a) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PDB-1183) Logs: Performance testing and proving of the solution before work commencement

2015-02-05 Thread Kenneth Barber (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kenneth Barber assigned an issue to Kenneth Barber 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 PuppetDB /  PDB-1183 
 
 
 
  Logs: Performance testing and proving of the solution before work commencement  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kenneth Barber 
 
 
 

Assignee:
 
 KennethBarber 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.10#6340-sha1:7ea293a) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PDB-1183) Logs: Performance testing and proving of the solution before work commencement

2015-01-28 Thread Kenneth Barber (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kenneth Barber updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 PuppetDB /  PDB-1183 
 
 
 
  Logs: Performance testing and proving of the solution before work commencement  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kenneth Barber 
 
 
 

Summary:
 
 Metrics Logs :Performancetestingandprovingofthesolutionbeforeworkcommencement 
 
 
 
 
 
 
 
 
 
 *Thisdoesn’tmeanbuildingitend-to-end,buttosimulatetheperfoftheproposedschemachangesandsolution.*Thegoalwouldbetoprovetheproposedsolutionisacceptableandexploreanyproposedalternativesbeforewedivein.* Inparticular, Weneedtoensure we shouldmakesurewecandoanadequateondemandgcstyle arehappywiththelog design *Theschemashouldbeproven , and thereisanalternateproposaltostorelogsintextblobsusingJSONserialisationalsothat weshould seeifitsactuallyeffectiveaskeepingtheamountofstoragelow investigate . 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.10#6340-sha1:7ea293a) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PDB-1183) Logs: Performance testing and proving of the solution before work commencement

2015-01-28 Thread Kenneth Barber (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kenneth Barber updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 PuppetDB /  PDB-1183 
 
 
 
  Logs: Performance testing and proving of the solution before work commencement  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kenneth Barber 
 
 
 

Sprint:
 
 PuppetDB2015-02- 25 11 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.10#6340-sha1:7ea293a) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PDB-1183) Logs: Performance testing and proving of the solution before work commencement

2015-01-28 Thread Kenneth Barber (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Kenneth Barber updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 PuppetDB /  PDB-1183 
 
 
 
  Logs: Performance testing and proving of the solution before work commencement  
 
 
 
 
 
 
 
 
 

Change By:
 
 Kenneth Barber 
 
 
 

Sprint:
 
 PuppetDB2015-02- 11 25 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.3.10#6340-sha1:7ea293a) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Puppet Bugs group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at http://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.