Hello,
I finished the cases in Calc, could you assign me more cases?
Thank you
On Mon, May 20, 2013 at 2:21 AM, Yuzhen Fan fanyuz...@gmail.com wrote:
Kay, thanks for the suggestion. I am going to open another mail thread for
Base test cases writing.
Regards,
Yu Zhen
On Sat, May 18, 2013 at 12:39 AM, Kay Schenk kay.sch...@gmail.com wrote:
On May 15, 2013 1:29 AM, Yuzhen Fan fanyuz...@gmail.com wrote:
Kay,
It's confirmed that we don't have Base test cases in place so far, Draw
is
the same case.
I agree with Rob that we define structured tests from now to have
consistent coverage. We (Liu Ping and I) can initial a test matrix to
organize test cases, and then call volunteers to populate the test
matrix
by writing test cases in TestLink. It is welcome if you can help on
writing
test cases. Thanks!
Regards,
Yu Zhen
Hi Yu Zhen and thanks for this reply. I would love to help write test
cases for Base at some point, but I don't have any training in QA, so I
would definitely need some instruction from somewhere on how to go about
this.
I think the biggest hurdle with base testing is the availability of
live
DBs for connectivity testing. Some of us would readily be able to set
something up, whereas others not. This would need to be some set of
servers
I would think that would house an ongoing set of tables for connectivity
testing for any release. So, how can we make this happen? We probably
need
an additional thread for that discussion.
On Wed, May 15, 2013 at 12:23 AM, Kay Schenk kay.sch...@gmail.com
wrote:
On Tue, May 14, 2013 at 5:29 AM, Rob Weir robw...@apache.org
wrote:
On Sun, May 12, 2013 at 6:52 PM, Kay Schenk kay.sch...@gmail.com
wrote:
On Mon, May 6, 2013 at 4:40 AM, Yuzhen Fan fanyuz...@gmail.com
wrote:
(Added dev in this mail thread ..)
Simon and all,
Here is the update of the preparation for full regression:
- All test cases are populated to test plan AOO 4.0 Full
Regression
Test
in TestLink
- Test guidance for Full Regression Test and Defect Verification
are
ready
and have published in wiki
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+Full+Regression+Test+Guidance
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+Defect+Verification+Guidance
- Defect verification list are generated per different products
with
multiple queries
Thanks Liu Ping to make defect queries.
Thanks Simon for guidance and reviewing all preparation work
above.
Regards,
Yu Zhen
I thought I might like to help with this. I'm interested in
testing
Base
portions, but, I don't see any tests that apply to Base. Are
there
any?
Test cases in Testlink are derived from the test cases used for
Symphony. But Symphony did not include Base.
So if we want structured testing of Base we'll need someone (or
several people) to write some test cases. Or we could do informal,
use-based testing like we did with 3.4./3.4.1. But best to get
some
tests defined so we can have consistent coverage. That will
require
that someone with expertise as a Base user step up to lead this.
Regards,
-Rob
OK...this is what I figured after a while. The big problem with
testing
for
Base is the availability of a test DB(s) to test connectivity in
some
way
-- our indigenous MySQL connector, jdbc etc. Any ideas about that?
On Mon, May 6, 2013 at 7:25 PM, Yuzhen Fan fanyuz...@gmail.com
wrote:
Simon and all,
Here is the update of the preparation for full regression:
- All test cases are populated to test plan AOO 4.0 Full
Regression
Test
in TestLink
- Test guidance for the Full Regression Test and Defect
Verification
are
ready and have published in wiki
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+Full+Regression+Test+Guidance
https://cwiki.apache.org/confluence/display/OOOUSERS/AOO+Defect+Verification+Guidance
On Fri, May 3, 2013 at 4:05 PM, Shenfeng Liu
liush...@gmail.com
wrote:
Hi, all,
I just want to update on our next plan for AOO 4.0 Testing.
Since
sidebar
FVT already finished, we are currently preparing for a full
regression
which will cover the following areas:
(1) Basic Function Verification
(2) MS Interoperability Test
(3) 2nd phase of sidebar testing
(4) Defect verification
So following works are on going:
- Yi Xuan and Yu Zhen are inputting test cases in Testlink.