Hi,
This is due to open on 9 December 2017. The entire railway is in place and the
remaining works are things like ticket validators, signage, depot / substation
works, tidying up, etc.
When should the railway be changed from railway=construction to railway=tram?
Stops are currently named "stop_name (November 2017)". Should this be changed
to "stop_name (December 2017)".
I'm going to see if I can get a trip before opening day - would anyone like to
come along? Having someone with a battery powered dash cam (or two - one with /
without audio) and a GPS unit would be good.
Colm
---
Never doubt that a small group of thoughtful, committed citizens can change the
world. Indeed, it is the only thing that ever has. Margaret Mead