[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973139#comment-14973139
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-Mapreduce-trunk-Java8 #581 (See 
[https://builds.apache.org/job/Hadoop-Mapreduce-trunk-Java8/581/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* hadoop-yarn-project/CHANGES.txt
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973068#comment-14973068
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-trunk-Commit #8703 (See 
[https://builds.apache.org/job/Hadoop-trunk-Commit/8703/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java
* hadoop-yarn-project/CHANGES.txt
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Subru Krishnan (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973062#comment-14973062
 ] 

Subru Krishnan commented on YARN-3738:
--

Thanks [~adhoot] for reviewing and [~asuresh] for committing the patch.

> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973100#comment-14973100
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-Yarn-trunk-Java8 #593 (See 
[https://builds.apache.org/job/Hadoop-Yarn-trunk-Java8/593/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java
* hadoop-yarn-project/CHANGES.txt
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973124#comment-14973124
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-Yarn-trunk #1316 (See 
[https://builds.apache.org/job/Hadoop-Yarn-trunk/1316/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java
* hadoop-yarn-project/CHANGES.txt


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973144#comment-14973144
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-Mapreduce-trunk #2525 (See 
[https://builds.apache.org/job/Hadoop-Mapreduce-trunk/2525/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java
* hadoop-yarn-project/CHANGES.txt


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973167#comment-14973167
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-Hdfs-trunk-Java8 #535 (See 
[https://builds.apache.org/job/Hadoop-Hdfs-trunk-Java8/535/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java
* hadoop-yarn-project/CHANGES.txt
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-25 Thread Hudson (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973151#comment-14973151
 ] 

Hudson commented on YARN-3738:
--

FAILURE: Integrated in Hadoop-Hdfs-trunk #2472 (See 
[https://builds.apache.org/job/Hadoop-Hdfs-trunk/2472/])
YARN-3738. Add support for recovery of reserved apps running under (arun 
suresh: rev ab8eb8770c8b8bff41dacb1a399d75906abb1ac4)
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/CapacityScheduler.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/reservation/ReservationSystemTestUtil.java
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/main/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/fair/FairScheduler.java
* hadoop-yarn-project/CHANGES.txt
* 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/TestWorkPreservingRMRestart.java


> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-24 Thread Arun Suresh (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973046#comment-14973046
 ] 

Arun Suresh commented on YARN-3738:
---

I agree that not much can be done about the checkstyle warning and the tests 
seem to run fine locally for me as well.
Committing this shortly..

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps running under dynamic queues

2015-10-24 Thread Arun Suresh (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14973052#comment-14973052
 ] 

Arun Suresh commented on YARN-3738:
---

Committed this to trunk and branch-2, Thanks for the patch [~subru] and for the 
review [~adhoot] !!

> Add support for recovery of reserved apps running under dynamic queues
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Fix For: 2.8.0
>
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-23 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14972369#comment-14972369
 ] 

Hadoop QA commented on YARN-3738:
-

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | pre-patch |  23m 38s | Pre-patch trunk compilation is 
healthy. |
| {color:green}+1{color} | @author |   0m  0s | The patch does not contain any 
@author tags. |
| {color:green}+1{color} | tests included |   0m  0s | The patch appears to 
include 2 new or modified test files. |
| {color:green}+1{color} | javac |  10m 55s | There were no new javac warning 
messages. |
| {color:green}+1{color} | javadoc |  14m  1s | There were no new javadoc 
warning messages. |
| {color:green}+1{color} | release audit |   0m 31s | The applied patch does 
not increase the total number of release audit warnings. |
| {color:red}-1{color} | checkstyle |   1m 11s | The applied patch generated  1 
new checkstyle issues (total was 189, now 188). |
| {color:green}+1{color} | whitespace |   0m  1s | The patch has no lines that 
end in whitespace. |
| {color:green}+1{color} | install |   1m 59s | mvn install still works. |
| {color:green}+1{color} | eclipse:eclipse |   0m 46s | The patch built with 
eclipse:eclipse. |
| {color:green}+1{color} | findbugs |   2m  3s | The patch does not introduce 
any new Findbugs (version 3.0.0) warnings. |
| {color:red}-1{color} | yarn tests |  58m 31s | Tests failed in 
hadoop-yarn-server-resourcemanager. |
| | | 113m 41s | |
\\
\\
|| Reason || Tests ||
| Failed unit tests | 
hadoop.yarn.server.resourcemanager.webapp.TestRMWebServices |
|   | 
hadoop.yarn.server.resourcemanager.scheduler.capacity.TestCapacityScheduler |
|   | hadoop.yarn.server.resourcemanager.webapp.TestRMWebServicesFairScheduler |
|   | hadoop.yarn.server.resourcemanager.webapp.TestRMWebServicesNodes |
|   | 
hadoop.yarn.server.resourcemanager.webapp.TestRMWebServicesForCSWithPartitions |
|   | hadoop.yarn.server.resourcemanager.webapp.TestNodesPage |
| Timed out tests | 
org.apache.hadoop.yarn.server.resourcemanager.TestWorkPreservingRMRestart |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12768455/YARN-3738-v4.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 86c9222 |
| checkstyle |  
https://builds.apache.org/job/PreCommit-YARN-Build/9557/artifact/patchprocess/diffcheckstylehadoop-yarn-server-resourcemanager.txt
 |
| hadoop-yarn-server-resourcemanager test log | 
https://builds.apache.org/job/PreCommit-YARN-Build/9557/artifact/patchprocess/testrun_hadoop-yarn-server-resourcemanager.txt
 |
| Test Results | 
https://builds.apache.org/job/PreCommit-YARN-Build/9557/testReport/ |
| Java | 1.7.0_55 |
| uname | Linux asf907.gq1.ygridcore.net 3.13.0-36-lowlatency #63-Ubuntu SMP 
PREEMPT Wed Sep 3 21:56:12 UTC 2014 x86_64 x86_64 x86_64 GNU/Linux |
| Console output | 
https://builds.apache.org/job/PreCommit-YARN-Build/9557/console |


This message was automatically generated.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-23 Thread Subru Krishnan (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14972409#comment-14972409
 ] 

Subru Krishnan commented on YARN-3738:
--

The test failures are unrelated to my patch. I ran the tests locally and they 
ran successfully.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-23 Thread Anubhav Dhoot (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14971817#comment-14971817
 ] 

Anubhav Dhoot commented on YARN-3738:
-

+1 pending jenkins

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-23 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14972167#comment-14972167
 ] 

Hadoop QA commented on YARN-3738:
-

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | pre-patch |  24m  8s | Pre-patch trunk compilation is 
healthy. |
| {color:green}+1{color} | @author |   0m  0s | The patch does not contain any 
@author tags. |
| {color:green}+1{color} | tests included |   0m  0s | The patch appears to 
include 2 new or modified test files. |
| {color:green}+1{color} | javac |  12m 29s | There were no new javac warning 
messages. |
| {color:green}+1{color} | javadoc |  15m 55s | There were no new javadoc 
warning messages. |
| {color:green}+1{color} | release audit |   0m 43s | The applied patch does 
not increase the total number of release audit warnings. |
| {color:red}-1{color} | checkstyle |   1m 19s | The applied patch generated  1 
new checkstyle issues (total was 189, now 188). |
| {color:green}+1{color} | whitespace |   0m  2s | The patch has no lines that 
end in whitespace. |
| {color:green}+1{color} | install |   2m 26s | mvn install still works. |
| {color:green}+1{color} | eclipse:eclipse |   0m 55s | The patch built with 
eclipse:eclipse. |
| {color:green}+1{color} | findbugs |   2m 22s | The patch does not introduce 
any new Findbugs (version 3.0.0) warnings. |
| {color:red}-1{color} | yarn tests |  65m 22s | Tests failed in 
hadoop-yarn-server-resourcemanager. |
| | | 125m 46s | |
\\
\\
|| Reason || Tests ||
| Failed unit tests | 
hadoop.yarn.server.resourcemanager.scheduler.fair.TestSchedulingPolicy |
|   | 
hadoop.yarn.server.resourcemanager.scheduler.capacity.TestContainerResizing |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12768376/YARN-3738-v4.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 15eb84b |
| checkstyle |  
https://builds.apache.org/job/PreCommit-YARN-Build/9553/artifact/patchprocess/diffcheckstylehadoop-yarn-server-resourcemanager.txt
 |
| hadoop-yarn-server-resourcemanager test log | 
https://builds.apache.org/job/PreCommit-YARN-Build/9553/artifact/patchprocess/testrun_hadoop-yarn-server-resourcemanager.txt
 |
| Test Results | 
https://builds.apache.org/job/PreCommit-YARN-Build/9553/testReport/ |
| Java | 1.7.0_55 |
| uname | Linux asf907.gq1.ygridcore.net 3.13.0-36-lowlatency #63-Ubuntu SMP 
PREEMPT Wed Sep 3 21:56:12 UTC 2014 x86_64 x86_64 x86_64 GNU/Linux |
| Console output | 
https://builds.apache.org/job/PreCommit-YARN-Build/9553/console |


This message was automatically generated.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738-v4.patch, YARN-3738-v4.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-23 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14971545#comment-14971545
 ] 

Hadoop QA commented on YARN-3738:
-

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | pre-patch |  19m 15s | Pre-patch trunk compilation is 
healthy. |
| {color:green}+1{color} | @author |   0m  0s | The patch does not contain any 
@author tags. |
| {color:green}+1{color} | tests included |   0m  0s | The patch appears to 
include 2 new or modified test files. |
| {color:red}-1{color} | javac |   8m 51s | The applied patch generated  1  
additional warning messages. |
| {color:green}+1{color} | javadoc |  11m 30s | There were no new javadoc 
warning messages. |
| {color:green}+1{color} | release audit |   0m 24s | The applied patch does 
not increase the total number of release audit warnings. |
| {color:red}-1{color} | checkstyle |   0m 59s | The applied patch generated  2 
new checkstyle issues (total was 189, now 189). |
| {color:green}+1{color} | whitespace |   0m  2s | The patch has no lines that 
end in whitespace. |
| {color:green}+1{color} | install |   1m 41s | mvn install still works. |
| {color:green}+1{color} | eclipse:eclipse |   0m 36s | The patch built with 
eclipse:eclipse. |
| {color:green}+1{color} | findbugs |   1m 36s | The patch does not introduce 
any new Findbugs (version 3.0.0) warnings. |
| {color:green}+1{color} | yarn tests |  59m 49s | Tests passed in 
hadoop-yarn-server-resourcemanager. |
| | | 104m 48s | |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12768332/YARN-3738-v3.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 934d96a |
| javac | 
https://builds.apache.org/job/PreCommit-YARN-Build/9549/artifact/patchprocess/diffJavacWarnings.txt
 |
| checkstyle |  
https://builds.apache.org/job/PreCommit-YARN-Build/9549/artifact/patchprocess/diffcheckstylehadoop-yarn-server-resourcemanager.txt
 |
| hadoop-yarn-server-resourcemanager test log | 
https://builds.apache.org/job/PreCommit-YARN-Build/9549/artifact/patchprocess/testrun_hadoop-yarn-server-resourcemanager.txt
 |
| Test Results | 
https://builds.apache.org/job/PreCommit-YARN-Build/9549/testReport/ |
| Java | 1.7.0_55 |
| uname | Linux asf906.gq1.ygridcore.net 3.13.0-36-lowlatency #63-Ubuntu SMP 
PREEMPT Wed Sep 3 21:56:12 UTC 2014 x86_64 x86_64 x86_64 GNU/Linux |
| Console output | 
https://builds.apache.org/job/PreCommit-YARN-Build/9549/console |


This message was automatically generated.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, 
> YARN-3738-v3.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-22 Thread Subru Krishnan (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14970245#comment-14970245
 ] 

Subru Krishnan commented on YARN-3738:
--

I tested the following scenarios successfully in my machine:
   * Created reservation, submitted jobs to it. Restarted RM and submitted more 
jobs to the recovered reservation.
   * Created reservation, submitted a longish job to it. Restarted RM and 
verified that the job was recovered under the reservation.
   * Created reservation, submitted a longish job to it towards its deadline. 
Restarted RM and verified that the job was recovered under the default 
reservation.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-22 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14969204#comment-14969204
 ] 

Hadoop QA commented on YARN-3738:
-

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:red}-1{color} | patch |   0m  0s | The patch command could not apply 
the patch during dryrun. |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12767945/YARN-3738.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 2798723 |
| Console output | 
https://builds.apache.org/job/PreCommit-YARN-Build/9521/console |


This message was automatically generated.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (YARN-3738) Add support for recovery of reserved apps (running under dynamic queues) to Capacity Scheduler

2015-10-22 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/YARN-3738?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14970352#comment-14970352
 ] 

Hadoop QA commented on YARN-3738:
-

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | pre-patch |  19m 31s | Pre-patch trunk compilation is 
healthy. |
| {color:green}+1{color} | @author |   0m  0s | The patch does not contain any 
@author tags. |
| {color:green}+1{color} | tests included |   0m  0s | The patch appears to 
include 2 new or modified test files. |
| {color:green}+1{color} | javac |   9m  8s | There were no new javac warning 
messages. |
| {color:green}+1{color} | javadoc |  11m 33s | There were no new javadoc 
warning messages. |
| {color:green}+1{color} | release audit |   0m 26s | The applied patch does 
not increase the total number of release audit warnings. |
| {color:red}-1{color} | checkstyle |   0m 56s | The applied patch generated  2 
new checkstyle issues (total was 189, now 189). |
| {color:green}+1{color} | whitespace |   0m  1s | The patch has no lines that 
end in whitespace. |
| {color:green}+1{color} | install |   1m 43s | mvn install still works. |
| {color:green}+1{color} | eclipse:eclipse |   0m 37s | The patch built with 
eclipse:eclipse. |
| {color:green}+1{color} | findbugs |   1m 39s | The patch does not introduce 
any new Findbugs (version 3.0.0) warnings. |
| {color:red}-1{color} | yarn tests |  62m 33s | Tests failed in 
hadoop-yarn-server-resourcemanager. |
| | | 108m 12s | |
\\
\\
|| Reason || Tests ||
| Failed unit tests | 
hadoop.yarn.server.resourcemanager.webapp.TestRMWebServicesFairScheduler |
|   | 
hadoop.yarn.server.resourcemanager.scheduler.capacity.TestApplicationPriority |
|   | hadoop.yarn.server.resourcemanager.TestApplicationMasterLauncher |
|   | 
hadoop.yarn.server.resourcemanager.scheduler.fair.TestAllocationFileLoaderService
 |
|   | 
hadoop.yarn.server.resourcemanager.webapp.TestRMWebServicesForCSWithPartitions |
|   | hadoop.yarn.server.resourcemanager.TestRM |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12768186/YARN-3738-v3.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 124a412 |
| checkstyle |  
https://builds.apache.org/job/PreCommit-YARN-Build/9536/artifact/patchprocess/diffcheckstylehadoop-yarn-server-resourcemanager.txt
 |
| hadoop-yarn-server-resourcemanager test log | 
https://builds.apache.org/job/PreCommit-YARN-Build/9536/artifact/patchprocess/testrun_hadoop-yarn-server-resourcemanager.txt
 |
| Test Results | 
https://builds.apache.org/job/PreCommit-YARN-Build/9536/testReport/ |
| Java | 1.7.0_55 |
| uname | Linux asf909.gq1.ygridcore.net 3.13.0-36-lowlatency #63-Ubuntu SMP 
PREEMPT Wed Sep 3 21:56:12 UTC 2014 x86_64 x86_64 x86_64 GNU/Linux |
| Console output | 
https://builds.apache.org/job/PreCommit-YARN-Build/9536/console |


This message was automatically generated.

> Add support for recovery of reserved apps (running under dynamic queues) to 
> Capacity Scheduler
> --
>
> Key: YARN-3738
> URL: https://issues.apache.org/jira/browse/YARN-3738
> Project: Hadoop YARN
>  Issue Type: Sub-task
>  Components: capacityscheduler, resourcemanager
>Reporter: Subru Krishnan
>Assignee: Subru Krishnan
> Attachments: YARN-3738-v2.patch, YARN-3738-v3.patch, YARN-3738.patch
>
>
> YARN-3736 persists the current state of the Plan to the RMStateStore. This 
> JIRA covers recovery of the Plan, i.e. dynamic reservation queues with 
> associated apps as part Capacity Scheduler failover mechanism.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)