Zoltan,
I'm pretty sure IBM they just want to cover all all the things that could
go wrong with that statement, as long as a downlevel client node isn't used
with a 8.1.2+ client version there shouldn't be any interruption in the
client activity.
There are also potential issues with tooling and
Thanks for all the feedback. Lots of good information. I did not mention
that all of my servers are 7.1.7.300 (soon to look at 7.1.8.000 just
release). I have no plans or desires to jump to 8.1.2/3 if it is going to
cause such disruption, especially if I have to run a utility on clients to
A 8.1.2.0 server should work with older clients as long as the node is in
transitional mode (q node f=d), when they jump to strict because, for
example, a 8.1.2 (or higher) client version restored something from that
node it jumps to strict and pre 8.1.2 clients will no longer be able to
connect