I'm guessing this group has collectively seen everything. Equipment was
installed in leased cabinet space in a data center just about 18 months ago.
The data center has APC PDU's installed in the racks. Visual aid:
My colleague went there today because two servers were both intermittently
There's a link for that here:
https://www.rd.com/wp-content/uploads/2021/07/amazon-fulfillment-centers-grid-collage.jpg
On Tue, Jan 30, 2024 at 11:42 AM Ken Hohhof wrote:
> A live camera of your finished goods shelves would be more fun. j/k
>
> Original Message
> From: "Forrest
A live camera of your finished goods shelves would be more fun. j/k
Original Message From: "Forrest Christian (List Account)" Sent: 1/30/2024
10:26:56 AMTo: "AnimalFarm Microwave Users Group" Subject: Re: [AFMUG]
Packetflux delivery timesWe used to do pretty good at almost always
Just get unlimited money and buy all the parts you need for 10 years. Duh?
On Tue, Jan 30, 2024 at 11:27 AM Forrest Christian (List Account) <
li...@packetflux.com> wrote:
> We used to do pretty good at almost always having stock, and if we ran out
> of something the replenishment stock was
We used to do pretty good at almost always having stock, and if we ran out
of something the replenishment stock was only a few days from being on the
shelf.
Then 2020 happened, and then supply chain crap happened, and a thousand
other things seemed to conspire to prevent us from getting back to
Sounds good, thanks for the update.
On Tue, Jan 30, 2024 at 11:07 AM Forrest Christian (List Account) <
li...@packetflux.com> wrote:
> Shipping out today. Along with all the other base 3 orders. We're
> finally almost all caught up. The base 3 was the last of the regularly
> stocked items
Pretty much all of the orders are going out today. A couple that need spec
I think this is the start of being at least intermittently back to all the
normal stuff usually being in stock.
On Tue, Jan 30, 2024, 7:45 AM Tyson Burris wrote:
> Yes, it’s a fairly common problem. I have gone 2-4
Shipping out today. Along with all the other base 3 orders. We're
finally almost all caught up. The base 3 was the last of the regularly
stocked items that we were backlogged on.
On Tue, Jan 30, 2024, 7:39 AM Josh Luthman
wrote:
> Has anyone ordered a Site Monitor this month? I'm at 2
Maybe bouses as a percentage of base base pay? That way the guys who have
been there longer or are better workers and have received raises for time
or performance get a little more. It also incentivizes people to be better
performers if they get a little more pay raise and realize that equates to
You'll probably have to ask for quotes to get good pricing from you local
supplier, but Edgeoptic lists 100G 80km optics for $1550.
- Jared
Sent: Friday, January 26, 2024
From: "Zach Underwood"
To: "AnimalFarm Microwave Users Group"
Subject: Re: [AFMUG] optical TX power levels
Jared,
Yes, it’s a fairly common problem. I have gone 2-4 weeks at times. I do wish
his website reported stock. I usually just assume a few weeks anymore.
Tyson Burris
President & CEO
Internet Communications Inc (ICI)
739 Commerce Dr. Franklin, IN 46131
[Mobile mobile-icon]317-412-1540
Has anyone ordered a Site Monitor this month? I'm at 2 weeks of pending
order and haven't heard anything.
I didn't want to open a Tech support ticket, Forrest. I don't mean to call
you out but I figured we're all friends here.