From: Nicolai Hähnle <nicolai.haeh...@amd.com>

The finish callback is responsible for removing the job from the ring
mirror list, among other things. It makes sense to add it as callback
in the place where the job is added to the ring mirror list.

Signed-off-by: Nicolai Hähnle <nicolai.haeh...@amd.com>
Acked-by: Christian König <christian.koe...@amd.com>
---
 drivers/gpu/drm/amd/scheduler/gpu_scheduler.c | 5 +++--
 1 file changed, 3 insertions(+), 2 deletions(-)

diff --git a/drivers/gpu/drm/amd/scheduler/gpu_scheduler.c 
b/drivers/gpu/drm/amd/scheduler/gpu_scheduler.c
index 6e899c593b7e..e793312e351c 100644
--- a/drivers/gpu/drm/amd/scheduler/gpu_scheduler.c
+++ b/drivers/gpu/drm/amd/scheduler/gpu_scheduler.c
@@ -388,20 +388,23 @@ static void amd_sched_job_finish_cb(struct dma_fence *f,
 {
        struct amd_sched_job *job = container_of(cb, struct amd_sched_job,
                                                 finish_cb);
        schedule_work(&job->finish_work);
 }
 
 static void amd_sched_job_begin(struct amd_sched_job *s_job)
 {
        struct amd_gpu_scheduler *sched = s_job->sched;
 
+       dma_fence_add_callback(&s_job->s_fence->finished, &s_job->finish_cb,
+                              amd_sched_job_finish_cb);
+
        spin_lock(&sched->job_list_lock);
        list_add_tail(&s_job->node, &sched->ring_mirror_list);
        if (sched->timeout != MAX_SCHEDULE_TIMEOUT &&
            list_first_entry_or_null(&sched->ring_mirror_list,
                                     struct amd_sched_job, node) == s_job)
                schedule_delayed_work(&s_job->work_tdr, sched->timeout);
        spin_unlock(&sched->job_list_lock);
 }
 
 static void amd_sched_job_timedout(struct work_struct *work)
@@ -480,22 +483,20 @@ void amd_sched_job_recovery(struct amd_gpu_scheduler 
*sched)
  *
  * @sched_job          The pointer to job required to submit
  *
  * Returns 0 for success, negative error code otherwise.
  */
 void amd_sched_entity_push_job(struct amd_sched_job *sched_job)
 {
        struct amd_sched_entity *entity = sched_job->s_entity;
 
        trace_amd_sched_job(sched_job);
-       dma_fence_add_callback(&sched_job->s_fence->finished, 
&sched_job->finish_cb,
-                              amd_sched_job_finish_cb);
        wait_event(entity->sched->job_scheduled,
                   amd_sched_entity_in(sched_job));
 }
 
 /* init a sched_job with basic field */
 int amd_sched_job_init(struct amd_sched_job *job,
                       struct amd_gpu_scheduler *sched,
                       struct amd_sched_entity *entity,
                       void *owner)
 {
-- 
2.11.0

_______________________________________________
amd-gfx mailing list
amd-gfx@lists.freedesktop.org
https://lists.freedesktop.org/mailman/listinfo/amd-gfx

Reply via email to